here [Music] i like to call before i do after that rather i want to get i can get a motion to approve oh i thought i was on you're good okay did they hear what i said already okay can i get a motion to approve the agenda please commissioner guerrero motion to approve the agenda a second commission spent that second becky board member smith yes former vega yes guerrero yes board member kaiser yes chair gordon yes all right is there any one who has a conflict of interest for tonight if not okay uh i need a motion to approve the agenda i'm sorry the minutes make a motion to approve the minutes i'll second it but before we do that is there any corrections if not i have one at the top of the minutes they have the date becky of december 28th should be january uh you'll correct that okay are there any other corrections all right seeing none could i vote please guerrero uh yes for member vega yes board member smith yes board member kaiser yes chairman gordon yes thank you okay thank you all right now is there anyone here this evening who wishes to address an item that is not on the agenda this evening you may have the opportunity to speak you can please raise your hand if you do all right seeing none and we'll move on on the agenda we have three postponements the reason that they are there is there is additional information that staff requires and because these items have been advertised they have been brought to the agenda but i'm going to have to figure out what is going to be best in order to postpone this what i'd like to do is to get a motion if it's agreeable to staff that we postpone this to make a date of your approval catherine commissioner members of uh the commission that would be that would be fine we could state it that way and be more generalistic or we could actually postpone these to a date certain and i would recommend for next month's meeting which is march i actually don't have that in front of me um let me look at a calendar i just don't want to make it a date certain if we still have the same problem that yes i mean we always run into that it is possible that we would advertise and then have to postpone again i see you want to make it a date certain i would prefer to make it a date certain if we do it indefinitely you could kill the project okay so could you tell me somebody tell me what that date is in march let me look on my calendar bear with me one moment that would be the 22nd thank you you're welcome okay thank you thank you all right then can i get a motion to um postpone these items till the march 22nd planning a zoning meeting uh mr gordon what exactly are we postponing items i'm sorry items 5.1 5.2 and 5.3 all right can i get him all right becky can i get a motion please can we briefly clarify which three items you said 5.1 5.2 and then i'm looking at i guess an old agenda that would be right but there's been a there's been an amended agenda so it would be 5.3 why one two and three i'll make a motion to postpone items 5.1 5.2 5.3 until mark the meeting march 22nd yes i need a second please i'll second it board member guerrero yes board member vega yes for member smith yes board member kaiser yes chair gordon yes thank you all right then we can move on to the consent agenda we have one item on the consent agenda is there anyone here who wishes to speak on this item if not can i get a motion to approve the consent agenda item 6.1 commissioner i'll make a motion to approve uh consent agenda a second puerto rico guerrero yes for member vega yes board member smith yes board member kaiser yes chair gordon yes thank you all right thank you and then next we move to old business there are items 7.1 7.2 and 7.3 are under old business what i'd like to do is to discuss but vote separately on items 7.1 and 7.2 so i need a motion to do that we can make a motion to combine seven one and seven two to discuss separately but the vote on each one i'm sorry we can discuss them together but we can vote on them separately uh i make a motion to combine seven one and seven two and vote on them separately commission smith that second fourth member guerrero yes board member vega yes board member smith yes member kaiser yes chair gordon yes thank you all right we have a presentation from staff bear with me while i get this opened all right catherine harrison rogers with staff i'm going to go ahead and talk about the bumblebee learning center master plan and corresponding zone changes this particular property is vacant and developed it's about five and a half acres it's located just west of holmen road and north of bataan memorial west with direct access off of battam memorial west it's currently zoned r2 here is a map indicating uh it's a little hard to see with that tan but there's the yellow line surrounding that it's a it's an odd shape and that's the parcel that we're discussing today here's an ariel it's a little bit more clear about where the parcel lies um what they're proposing is both a master plan and then corresponding zone changes um to align with that master plan uh 4.12 or thereabouts is the acreage that's proposed to be modified from r2 to c3 commercial zoning districts would ultimately front botan memorial west with the multi-family dwelling residential land uses closer to that holman roadside there are some conditions that have been proposed by the applicant one of which is new one is that the land is limited i'm excuse me the uses are limited to the uses specified in attachment number three and that's specifically for the c3 properties you also received a handout this evening indicating what those uses are additionally there are limits to the building heights that require that no more that the buildings can't be higher than 35 feet this is phased ultimately if these are to be approved this would be developed in individual lots via the alternate summary subdivision process which is an administrative process they're proposing no more than three parcels ultimately during staff review this met the requirements of the subdivision code the design standards and the zoning code is amended just so you have a clear picture of what's going on the proposed c3 uses which are those high intensity commercial uses would be located essentially in this area and then the existing r2 would remain that's the multi-family uses in this area staff did send out public notice and there were also some other methods of public notice that occurred during this process notice was sent to surrounding properties prior to the pnz meetings of december this was heard before and then of course of this meeting tonight early notification was also sent by the applicant and i'll let the applicant speak to what occurred at that meeting if you would like input regarding that and city staff did receive input from the public via phone as well as email um speaking about any future commercial development and ultimately any nuisances or impacts that occur could occur as part of that would like to point out that the drc the development review committee also did review this plan december 8th specifically the master plan not necessarily the zoning and that was recommended for approval i do want to speak to what occurred during the december 28 2021 pnz meeting during that time there was a lot of input both from the commission as well as from the public ultimately some of the biggest commission concerns regarded were in regard to access easements leading to any future lots and then the lack of the the details in terms of site development there was an interest in in really seeing sort of the fine details and i'm going to speak a little bit to where we are in the process and why perhaps those details aren't provided the public also spoke at length regarding their concerns about increase in traffic the potential for increased crime building heights being too high for the area issues regarding solid waste pickup and ultimately nuisances that could come along with that concerns about new lighting that may be problematic noise land values um and then buffering there were a couple of other comments of course but those were the highlights some of the modifications that came about as as part of that were to the plan to the master plan in particular and as well as a proposed condition hearing that there were some concerns about maybe having some buildings that were too large blocking views things of that nature the applicant did propose a condition upon themselves to limit heights to 35 feet that would be in keeping with the same height limits that all of the other surrounding properties currently have additionally there was some added language on the master plan regarding both internal and external access as well as some detailed information regarding the traffic assumptions at that location i do want to speak a little bit about the development process and kind of where we are or where the applicant is in terms of the process right now we're just at the beginning of the process the applicant is essentially here at master plan and zoning there are a lot more steps that lead to those specific site details that i know people had a lot of questions about which is way over here at the very very end when construction and when building permits ultimately come in for site-specific development and so i did want to outline what we're considering tonight are only the master plan and the zoning and not site-specific development just because of where we are in the process and we're not quite at that stage in terms of having either the engineering or the architecture available to view ultimately master plans are really intended to be conceptual basically could what's being proposed work at this location would it work and then zoning of course establishes a range of uses and the standards that go along with that and ultimately what we need to ask ourselves are the range of uses appropriate at this location based on elevate las cruces adjacent roadway classifications the character of the area as well as other considerations some other things that that i do want to point out is again site-specific development comes at the end of the process and right now they can't even design the site without having those established regulations from which to design from staff of course is not the final authority we're just a recommending body a recommending um entity pnz is the final authority on the master plan and ultimately you're recommending body to city council for the rezoning the city council will determine whether or not the rezoning is appropriate at this location i'm requesting uh and as should happen because these are two separate projects that individual motions happen for each proposal um we are recommending approval of the master plan and then approval with conditions for the zone change of course staff outlined those findings in the staff report and they're listed here as well and then again some of the conditions um have to do with uh the land uses being limited uh you all received a handout in regard to that as i understand it and speaking with the applicant's representative those have not been changed from what's in your packet uh they're just reiterating what uses are are allowed and what's not allowed and that the building heights be limited to no higher than 35 feet at this point you have some options you can vote to approve you can vote to deny yes with conditions or to table denial requires alternate findings that support that denial to be articulated by the commission and of course we do have the applicant here to talk about the details and maybe answer any questions that you had or any concerns that were brought up from the last meeting they do have a presentation ready and as i understand it there are several members of the public that also have additional concerns or questions that would be available to speak as well so with that i'm happy to answer any questions or turn it over to the applicant i'd like i guess we'd like to hear from the applicant and it's not necessary to state your name it's mr kirk clifton but you should for the record kirk clifton aicp sauder miller and associates okay like this where you win you know they're you know the came do you swear for him that the testimony are you about to give is the truth or nothing but the truth on the penalty of law i do thank you thank you okay once again my name is kirk clifton i represent the applicant i'm with sauder miller and associates um and i'm here to hopefully guide us through the zone change and master plan process uh it's a pleasure to be before you on this side of the fence it's been a while commissioner gordon uh and staff nice to see you once again as well so i i'll try not to regurgitate too much of what's already been discussed but i i would like to point out there are some things for the record that should be noted the property is currently zoned r2 the applicant has agreed that the proposed c3 parcel will have a maximum allowed height of 35 feet c3 typically allows up to 60 feet in height and the proposed zoning of c3 commercial high density on the parcel fronting battan memorial only the r2 piece remains as it was presented during the previous hearing and that is in this general vicinity and as you can see neither one of these parcels have any access to holmen road project ariel here's a proposed master plan as as noted this actually shows the demarcation between the r2 and the c3 commercial use for the master plan i won't go through the purpose of a master plan but as you know as a commission master plan does occur when there are multiple land uses involved or there could be potentially an alternate summary subdivision process utilized on the commercial property as well in terms of the zoning it is currently r2 and again the c3 piece strictly fronts on batan memorial with r2 behind it through the process with staff and subsequent building permits medals an access agreement will be established as noted on the master plan the r2 piece will have access off bataan memorial west and not holmen road as you can see there is no direct access through the neighborhood or to holman road area traffic was briefly discussed as i uh read through the minutes and was briefed on the previous meeting it should be noted that bataan memorial west is currently designated on the messiah valley mpo thoroughfare plan as a minor arterial as such the february 2022 traffic count data shows a daily traffic volume on battalion memorial west of 1789 vehicles per day the highway capacity manual which is essentially the bible of all traffic traffic engineering indicates that this two-lane roadway will carry 40 800 vehicles per day and 1700 vehicles per hour and i just kind of want to you know lay out the the tr the transportation infrastructure that currently exists as is the access will be granted permitted through the new mexico department of transportation to bataan memorial west and the traffic generated from the proposed master planned area will have no impact on home and traffic as as previously stated access will solely be from bataan memorial west essentially a ride in right out i won't go through each of these but these are the uses that have been stricken from the commercial c3 high intensity i know staff do you want me to read through these i hope not thank you i think the audience thanks you as well but there are several pages it's the entire list found within the zoning ordinance so as zoned as as you're all aware this is r2 and as it stands today you could put a what would equate to a three-story apartment complex up to 35 feet in height and on the c3 piece that i'm talking about specifically that we're requesting the zone change on and as part of the master plan you could get up to 62 apartment units in that facility and i know there were some concerns with setbacks and bufferings and i'd like to just briefly talk about the r2 setbacks for these apartment structures under r2 zoning you can get 15 dwelling units per acre that's a 20 foot front setback seven foot rear and a seven foot side 35 foot maximum height so that's as it stands today and what we're proposing on the peace front in batam memorial west is the c3 and what we do know today is that one of the uses that's going to be going on there is an early childhood education facility called bumblebee learning center and this learning center is serves as a pre-k and up uh facility for children and you know i can speak for myself being a parent of children in the las cruces public school system and having just gone through the covet situation you know now more than ever we could really use a facility like this and you know and i would ask you to consider the positives in this application and we're you know again we're not here to talk about site design site development that comes later on in the process as catherine pointed out in her presentation as well this is strictly about the zone change and the use of the c3 conditioned with the stricken uses and a reduced height of 35 feet and as our you know our traffic experts have determined there are no significant impacts there will be no traffic generated onto or from holmen um the site will eventually you know essentially capture traffic maybe coming from the neighborhoods off holman going into town and that's it so with that said i'd be prepared to answer any questions the commission may have or staff needs any additional information thank you anybody from the commission you have any questions go ahead i have a couple of questions but i appreciate some of the clarity around what would happen if there wasn't a zone change here i was hoping if either yourself or staff could answer the question about the access to the remaining r2 parcel reading through the the staff report um and the minutes from the la are from when this appeared back in december it sounded like there was a requirement to have two forms of access to that remaining r2 which would require some sort of access easement across a a private parcel to i presume holman road i was wondering if if anyone could sort of speak to that component and and how that plays into this possible zone change excuse me members of the commission commissioner kaiser i would like to speak to that absolutely provide some clarification perhaps i think during the discussion one of the topics was well how are they going to access and a number of options were laid out there well most likely they would go through the existing property with an easement established at the time of subdivision to access that r2 another possibility could have been going through the private property but that's less likely because they would have to negotiate with a private property owner to access through that to access holman road the likely scenario and as was indicated by mr clifton here was that they would be accessing through their existing property from batan utilizing an access easement ultimately established at the time of subdivision thank you for that um another question about the the uh uses um that are being proposed here how exactly would that work it seems like we're getting into kind of an overlay zone territory here as far as if this site were to be sold at a at a later point how would the limited uses carry over and how would they they play out for the i guess in perpetuity sure i'm happy to answer that as well um this is not an uncommon um practice in the city of las cruces where um a developer or the the commission or even city council uh deems certain uses undesirable for adjacent neighborhoods or or generally the location uh being discussed and what happens is those become an exhibit as part of the ordinance and they are tied to that zoning in perpetuity thank you i think my my last question for the moment is there's no question this is a tough site to develop but i i think to sit here and say that there are no impacts at all as as that would come as a result of this zone change i don't think is necessarily a true statement um one is across this country we're in a desperate need of housing so to take away potentially 62 units on this parcel and have i don't know one or two businesses including a child care center that has almost no relation to the neighborhood behind it because of the access issues that we've just talked about you are going to have impacts you are going to have traffic impacts if someone wanted to from the neighborhood uh send their kids to this this daycare center they have no choice but to drive there's no pedestrian access there's no other way to get to the site safely and uh i just want to kind of bring that up and and that you know there are impacts here and i'm not sure if the applicant has considered the types of uses and how they would service this particular neighborhood i guess that's just more of a comment than a question thank you commissioner uh mr chair commissioner kaiser i appreciate your comments and and really sure there's going to be some impacts but they're negligible and as i demonstrated with the highway capacity as as built today those impacts would not be filled there it's well below capacity and and quite frankly you know most working-class folks that live in the area that would be utilizing a facility like this probably won't be walking they'll probably be driving on their way to work to drop their student off so you know i look at it from more of a global land use perspective in what's in the area and sure yes we are lacking in some areas some residential but there is quantifiable justification for mixed-use development and in essence that could potentially reduce traffic patterns in other parts of the city where there could be an influx of people dropping their children off so this is you know paired up with that live work play type situation and as you've seen there's a sea of residential out there and i can't think of a better use than a child care early learning child facility such as this i certainly agree with the comment that that this is a much needed service but i think there's questions about whether or not this is the right location at least in my mind okay thank you anyone else i have one question the the the application is titled a learning center and my concern and i asked at the last meeting back in december as to whether or not this is going to be a care center or a learning center i keep carrying two different stories and if it's going to be a learning center at what age are they going to start bringing in children four or five years old three years old i mean not going to bring in a baby that's one year old and try to educate it or is it going to be a day care center and an education can somebody please give me a definitive answer as to what it is because this is titled bumblebee learning center it is indeed mr chair members of the commission it is indeed a learning center for children that are pre-k and slightly younger what i would envision it as they've they have these these facilities in other parts of the region but the las cruces public schools has a program called dd preschool and that begins taking in students at age three and although they're young it's still an educational facility so there's still a learning aspect of them there it's not just drop your kid off we're going to babysit him come pick him up you know when you're done working it will have an education component and that's the whole the core of the businesses is learning it might be younger students but they'll be learning while they're there it's just it's not just a daycare facility okay and just one other item i have a question if you can go back to the map of the of this of the r2 and c3 just to show that the not that the staff's map no just the word shows the property that's it right there is fine it was stated that there's going to be some kind of an easement for people to get from the bataan memorial to get to us we assume they're going to be some kind of residences in r2 and what kind of an easement it just seems to me that somebody's just going to drive up through c3 and make a right turn to go into r2 i mean it's all one property yes mr chair members of the commission that is accurate and you know in working with commercial development for a number of years now it's it's actually quite common to have a shared access agreement with the budding parcel so so essentially this will be an approved access by the city of las cruces which will also include the las cruces fire department that will provide reasonable access two-way access to the r2 site for multi uh medium density multi-family housing so that'll that'll be established um with the plating i understand that on there yeah that's fine all right that's all i have is uh thank you very much and real quick if i could the actual applicant is here that could tell you a little more about the facility if you'd like to hear it absolutely we'd love to thank you good evening commissioners and chairman am i going to be sorghum or my name is daisy leeda daisy lita okay i have to swear you in please do you swear for him that the testimony you're about to give is the truth of nothing but the truth on the penalty of law okay could you please speak a little louder and into microphone so we can hear you yes okay so the the question was asked if we are learning center child care or daycare um we are a learning center education starts in the womb so we do work with parents even when they're pregnant with moms we give them the tools so that they could get their or take their pregnancy to a healthy pregnancy throughout we do have we do serve children ages six weeks to 12 years old and so we do serve children that are babies and that's when they are learning the most so from zero to five years old that's when a child learns the most and they're at their full potential and so our mission at the bumblebee learning center is in collaboration with our parents in our community it is to provide children with quality child care and learning experience while providing excellence education in a healthy and safe learning environment where children are prepared with critical skills developmental and social creative and emotional physical inter intellectual skills to reach their full potential so learning starts at the womb and we do we do you know take care of our families we take care of our children and i pride myself to be one of the best learning centers in new mexico yes did that answer your question sure all right thank you does anybody have any questions all right thank you thank you all right then we can go to the public um is there anybody here this evening who wishes to talk on this says please raise your hand just one person all right sir would you the two people all right we'll start we'll start the gentleman in the back all right come forward touch you sir yes yeah i'll give him three minutes we'll allow you to speak for three minutes just please please state your name and let me swear you in please yes sir jambola okay do you swear affirm that the testimony you're about to give is the truth and nothing but the truth under penalty of law yes sir go ahead thank you thank you um boy where to start the comment of no impact of home and road traffic i can't believe that would even be stated that's just so ridiculous i have a photo here because as i had commented in december about traffic this is coming off of us 70 heading north on holmen where the two elementary schools are located okay so if someone's coming east on 70 going to go to the daycare center they have to come around and do this i'm from the midwest michigan left to get into this day care center how you going to deal with that kind of traffic on top of what we already have how can you say there's no impact they have obviously not been out there to see this type of traffic shame on them shame on them so at the december meeting it was suggested and agreed the developer to meet with the residents to discuss concerns and objections that has never happened there is a day care center less than four miles on the north side of us 70. wouldn't it be more beneficial to build a day care center learning center however you want to phrase it on the south side of us 70 as opposed to the north side there's also as was proposed and again as a resident of that area i have not been informed of any changes to the master plan any changes to what's coming in what's going to be put on these parcels so the question of brought up in december was a self storage facility well there's one that's less than two miles away from this proposed area already and they're already expanding so why do we need another it was referred to a number of times in the december meeting about elevate las cruces and that plan that's been put in place and everything that was put into developing that plant so as per a per the approved final document january 30 2020 lesson or just over two years ago it shows in states the following figure 3.4 the proposed land area is to be used as a suburban neighborhood definition suburban neighborhood by the state or by the plan low to moderate density residual land use predominant land use is single family detached dwelling but limited to areas may be developed for multi-family dwellings then also on figure 3.2 growth forecast there's going to be an added 38 350 new residents between 2018 and 2045 which equals fifteen thousand three hundred fifty new households with an additional sixteen thousand one hundred new housing units all this on a report that's barely two years old and already being asked to change to research and discovers what does what designated commercial properties now are going to be rezoned to residential to accommodate the houses that we're losing by changing this zone and last but not least i know i'm learning a little bit over very next exit there's commercial property already for sale it's already zoned so why are you coming to us when you don't have to go two miles that's less than a mile away land for sale already zoned commercial why bother us thank you for your time thank you in the first row please state your name please crystal garcia let me swear you in do you swear firm that the testimony you're about to give is the truth or nothing but the truth under the penalty of law yes thank you go ahead three minutes all right thank you for the opportunity to speak commissioners my name like i said is crystal garcia i'm a local realtor here in the city and i actually live really close to the subject property and i just simply wanted to express my support for the rezoning of this parcel in particular for the c3 zoning change that the learning center is seeking as a realtor i have seen more and more younger families with small children pour into our city and in particular up highway 70 all the way up to nasa exit although i know a lot of that is counting there are two reasons why i'm in favor for this change one is due to the fact that the state of new mexico is ranked dead last in public school education and in and if early education centers like this can come and provide the children in our communities a chance to improve their academics by starting them early in their education then i don't see why anyone wouldn't want that and then two simply is to accommodate the population growth as it was just stated as cities grow the more land is developed yes especially ohio and highway 70 we're going to need more amenities and i think this is going to help that cause so um and then also last i believe that this development will help just just that and will also help complement the planned elevate las cruces comprehensive plan that you guys have and that's all i have for tonight just wanted to show my support for that development and thank you again for letting me speak thank you all right thank you does the applicant wish to respond to any of these comments thank you mr chair members of the commission uh the only statement i'd like to make at this time is that there will not be any storage units that that's not even a use being considered tonight as i mentioned we discussed the c3 piece and the r2 will remain r2 as zoned for those permitted uses is there some reason that i know we discussed and at the december meeting that there was there was supposed to be an attempt by the applicant to meet with the community and apparently that has not been done can anyone answer to that i think that it would have been nice to have had some input from them and had some kind of a meeting mr chair members of the commission my understanding is that there was correspondence with the neighborhood through email no excuse me please if you're going to speak would you please state your name and let me swear you in my name is michael johnson all right do you swear affirmative testimony you're about to give is the truth and nothing but the truth and the penalty of law i do thank you go ahead early on in the process we sent emails as part of the early notification process to the residents at that time we had a proposed c3 use on the entire property that we're discussing today the 5.1 acres as a result of the feedback we received from the neighborhood at that time we've heard discussion the r2 zoning was proposed to be a storage unit facility based on the feedback we got from the neighborhood we received i think they're part of your packet five or six emails we changed that we we removed the self storage units and just left that as an r2 zoning and that was a direct result of the of the feedback we received from the neighborhood at that time so we have just come forward to continue to have the property that's fronting on baton as the c3 zoning and then we would leave the back parcel as currently exists so that's in response to your question mr chairman one other comment i would like to make my name is michael johnson i was a traffic engineer for the city of las cruces from 1984 to 2000 and then i was in charge of traffic from 2006 to 2011. so i'm very familiar with traffic in the city of las cruces i'm very familiar with how it acts how it's going to respond and those comments regarding traffic maybe we shouldn't have made an absolute statement that will have no impact but the impact that these residents or this business will have on the school traffic of the elementary schools on holman road is very minimal at the best so i would like to put that on the record and just so we are talking that way thank you sir all right thank you just let me think for a minute i realize that approving the master plan doesn't give us any information as to what's going on what's going to go on this property it might help us in thinking about what the zoning change will mean but i think at this point is there i will go back to the audience again is there anyone else who'd like to make a comment now considering the fact that what was just said all right well let's start in the first row this lady i will give you just a couple of minutes to respond to his comment be careful can somebody help her could you please state your name my name is carol main all right let me swear you in do you swear affirmative testimony you're about to give the truth to nothing but the truth on the penalty of law i do okay go ahead ma'am two minutes okay it was our understanding as i believe was yours we were supposed to have a communication since the december meeting that has not happened they did not address that we're yes we responded back after we got the email in august for it and we talked about at the december meeting but there has been no further communication since december that's the point we don't know about all these changes until he said it right now nobody told us anything that's all i got to say all right thank thank you someone else ma'am please state your name i lean on breeze all right let me swear you in please do you swear from that testimony you're about to give us the truth and nothing but the truth on the penalty of law yes go ahead two minutes one of my concerns is once this is if this zone rezoning happens and these individuals decide oh we don't want to go forward with this learning center we want to sell this property even though it has the 35 foot implementation or whatever it is that you called it they could go in and easily put something else in there rather than a learning center is that correct i i believe so that they can do that they have the right to sell it it's rezoned and that's a concern as well with the property values going up commercial property other you know all properties may be beneficial to not do a daycare or do a learning center and we're going to sell this and then something else come in like family dollar or something that we really don't need there the problem at the moment however is that they're very specific in what they're talking about on a property that is c3 that they're going to put in a learning center i also believe that they talked back in december that there was also going to be a couple of small businesses attached to it uh i don't really remember being very specific but at this point we don't know but they're saying that that's what they're going to do but they do have the right to sell that property that's a concern oh we don't know i mean we have to go on on what what is being presented to us this evening right but that's always a possibility that's why this is always a possibility in anything it could happen that's a concern yeah well thank you i understand your feelings does a gentleman want to make another comment but i'll only give you two minutes this time since you've already been sworn in just repeat your name please john bola um out of curiosity as far as the learning center is concerned how many students children do you intend to have at this location so seven thousand square foot building unfortunately her answer is inaudible to us and to a recording person if someone would like to just respond to that okay so we currently have um facilities i currently have four facilities and all my facilities are under 100 children um there's two facilities that are 50 and the other two are 100 so it's under 100 we are a five-star center we we do strive to be the best high-quality early learning center that you could find in the state of new mexico and like i said we have been since 2007 we've been doing this for a lot of a lot of years and that's just my biggest um you know that's my passion to do and i i i wouldn't sell it i really wouldn't sell it i've been working you know for this for a lot of years and it's it's a dream of mine so i just want to continue to grow and i really don't think that there shouldn't be anything to worry about i understand and i understand talking to the microphone i understand everybody's concerned but yeah it's it's really um like i said it's a high quality learning center in regards to the schools i know that you mentioned the the parents going in this would alleviate actually traffic because we have two vans or depending on how many right we have the vans and we get all the children so the parents go after six to pick them up and so it would alleviate traffic from the schools at three four and when they get out but is it possible that you can just tell me is that the only thing that's going to be on this piece of property is just the learning center excuse me sir no my vision is for us to have the learning center the other ones would be um i don't know if you've heard of third party um intervention specialists so that they could help the children and the families so aprendamos trisco that's what i would want to see so that the children that are in my care while they're in my care they're able to get therapies right next to them so we could just kind of make it a flow like more of a i wouldn't want anything else other than something that would help the children and would work hand in hand with us all right thank you i'd like to end this discussion now just one item and that's it okay um also in december it was discussed that there would be an easement between the building and the residences which i am a member i am a resident that would be backed up against this property it was stated 15 feet i'm curious you got power lines does that 15 foot include the 8 foot easement for the power lines or is that going to be on top of so it's actually going to be 23 feet and along those lines why is every other commercial property along that frontage road 40 feet away from any residents thank you all right then i'd like to close this discussion we have another gentleman all right sir are you going to say something other than what's already been said or you just agree with has been said be careful all right please state your name my name is brian breitai please speak into the microphone i'm usually not accused of not speaking loud enough so my name is brian breithag all right let me swear you when do you swear for him that the testimony you're about to give is the truth and nothing but the truth under penalty of law i do all right go ahead two minutes yes and it won't take that long if i'm lucky i still didn't get an answer is it 50 or is it 100 students this is not a point for cross discussion if we please address the commission and if necessary okay if necessary we'll get an answer okay thank you also there was a list of non-users that mr clifton had shown he's talking to the microphone sorry i'm sorry we have what this is being recorded so we she has to hear what you're saying i understand sorry i would like to see the list of what they're not going to put in there now that's something that should have been given to us before this meeting don't doesn't anybody agree or doesn't anybody think we shouldn't have had that anyway also i understand that the lighting the wall height and all this will be just discussed at a later date when we get to planning is that correct yes okay that's all i have all right thank you all right that is the end of discussion are there any questions from the commission do you have a question no not so much a question but just a comment uh you know just first of all i just want to tell everybody this here you know we do appreciate you being here um but unfortunately what we're discussing is just the zoning it's not what the property is going to be used for so you know just would appreciate moving forward if we can just kind of keep that going that's it all right if not then i think that we are ready for a vote so we have to vote on these two particular items 7.1 and 7.2 separately so i'm going to need a vote on each one catherine you have something to say mr chair members of the commission i just do want to remind you that there are some recommended conditions associated with the zoning so if a motion is made and you are in agreement with those conditions i would recommend stating them one being the height limited to 35 feet and the other limiting the uses to those that were outlined in attachment number three okay and i want to also remind everyone that the zoning change will have to go to the city council correct and in that case i should also remind everyone who is if if the commission does vote to approve this zoning change then you do have the right to appeal before city council if you object so then i'm going to need a motion on 7.1 i'll make a motion to approve uh seven point uh item number seven point one yes which which is a master plan i need a second vega a second board member guerrero uh yes i approve based on uh um just just approving him um due to city so i mean due to first of all i mean it does fit the comprehensive plan um and i mean i personally believe that they could barbie would benefit the community thank you board member vega i vote yes based on staff recommendations and it fits with the elevate las cruces comprehensive plan board member smith although yes based on staff recommendation and also meets the objective of the master plan board member kaiser yes based on staff recommendation chair gordon i wrote yes based on my site visit the discussion this evening goes along with elevate las cruces and our staff recommendations so i vote yes thank you now i need a motion on item 7.2 which is a zoning change remember with conditions of the 35 foot height and what was the other one uses as outlined in attacks right number three of the list in detachment three right make a motion to approve item 7.2 regarding the zone change commission smith i second yes based on the same uh uh reasons earlier uh and staff recommendation as well board member vega i vote yes based on the um but to include the conditions outlined by staff um including the height and all of the different um line uses that were pointed out in attachment three board member smith of oh yes based on staff recommendation and also the the changes um that were included as far as the the height variance remember kaiser uh yes based on stack of recommendation though i encourage the applicant to look seriously into non-automotive connectivity to the neighborhood chair gordon also when again on my site visit i also vote yes with conditions and it does go with elevate las cruces in that case i do vote yes thank you so i believe that's 5-0 thank you okay now we move on in the agenda to item 7.3 which is the amador avenue variance request mr podegas commissioner gordon members of the commission if i can get this launched here vincent banegas for the record interim planner i will be presenting the variance request for 1413 east amador avenue the this is uh in essence the second time it's reached the agenda stage first time we've gone through this that'll we'll go through it with great length and detail but it involves property at 1413 east amador avenue and as i will show you it will include three variants aspects to the request it's currently a restaurant use and has been for some time now it's roughly 0.6 acres in size it's currently zoned c2 which is our commercial medium density zoning district and was created at least that lot was created as part of the las cruces park edition 29 subdivision and the structure was constructed in since then obviously as it's become used as the restaurant uh delicious restaurant in place now there have been some renovation and some expansion projects associated with that over the years and this would certainly serve as one additional one should it be approved in the manner presented so the zoning map shown here identifies the property in red it again c2 zoning east amandor is located here south nevada street located to the east and then solano drive at the the western location so you do have existing uses adjacent to it this small triangular piece right now is is vacant raw land and then this structure on this eastern property suffered some roof damage and has since been demolished so it is presently vacant as well but this is the property in question you have adjoining zoning further out a single family residential uses or zoning to the east and then you got some multi-family low density zoning in the form of r2 over on the west this is the aerial map that shows the property again you can see that the building that has since been removed sits here this is a funeral home off to the north and an existing i believe it's an auto repair shop directly to the west and a variety a mixture of other both residential and commercial uses along east amador avenue stretching downtown along the way so the the applicant has has come forward and indicated that they're wishing to uh install an outdoor terrace it would be adjacent to amador avenue approximately 950 square feet in area and as a result of that that triggers an expansion of the existing restaurant use so that non-conforming aspects on the property have to be brought into compliance so what they're having to look at is parking first of all with the outdoor terrace being proposed they are going to be required to provide auto parking stalls on site they are deficient 10 stalls and so they can provide the 31 they originally showed 33 but two had to be excluded due to clear sight triangle provisions in the code so the variant seeks to allow a 10 stall deviation the front setback along amador avenue there's a 15 foot setback required based on the site plan that i'll show you in a little bit it appears as if it gets really close to the full depth and so it's advertised as a full 15 feet it may be a little less than that hence the plus or minus giving us a little latitude and then the landscape area they're deficient based on the expansion they would have to provide an additional 393 square feet of landscape area based on calculations as it looks at both what exists and what is proposed all told you're looking at 3116 square feet of landscape area required and they're going to be shy by 393 square feet in talking with the applicant they are able to meet the quantity aspects in our design standards there's calculations for landscaping both in terms of quantity of product installed in the landscape area so they can meet the quantity calculation requirement it's just not the area that they can meet at this point in time so the applicant has submitted their request citing the following justification bullets if you will basically the flexibility that the terrorist provides is is a substantial benefit to the business because of pandemic related issues obviously there were limitations as to how many people could be within the building and having opportunities outside the building was was considered a benefit to the applicant and to the patrons that go to the restaurant there's also the ability to enhance the patrons dining experience there with a restaurant by providing an outdoor seating environment and then also they cite that the area where they are currently located basically have businesses that close up shop right about 6 pm so this gives an opportunity to allow a business that's opened up a longer period of time providing some activity to the area this is the existing site plan this area here is predominantly the largest portion of their landscape area as they have it shown you do have some other spots elsewhere on site but they are much smaller your primary access is here and you have other ingress egress here at this location so just to show you this is the area that the next slide will identify as the area for the proposed terrace and this is what they provided you see the terrace boundary here delimited by what will be a rock wall or or a wall of some fashion and you have tables situated with these little squares identified on the terrace area they do show a ponding area here as part of the review process a few things came to light there is some water line that is currently encroached upon by the existing building not to mention what would be proposed that is a building permit issue and will have to be resolved at that time i'm just pointing it out because that was brought up during the review process there is concern that this ponding area may further uh disrupt the line so they're going to have to do something with that maybe relocate it but again that too is a building permit issue but this is what they're showing there's not going to be any physical structure attached to the building they're going to probably have a removable shade canopy that they can pull out and retract but fire made it clear in their review that there was not to be anything physically attached to the building which the applicant is fine with here's a few pictures of that area this is the southern facade of delicious as it is today and so you're talking this area in here where where the terrace will be a couple more photos this is the eastern facade for the most part showing that existing ingress egress and the eastern facade again ingress egress here notice was sent to the surrounding properties i did receive two phone calls as of today one was just a general inquiry they were just simply curious as to what was being requested and asked for clarification another was from the property owner of the funeral home indicating that they weren't opposed to what was being requested they thought it was a wonderful thing that the business was growing in the manner it was growing but that apparently they had a gentleman's agreement for some overflow parking but they weren't there was nothing formal nothing written and they would not be allowing that to continue so at least from overflow parking from the perspective of the funeral home that's not an option but perhaps from the other properties within the vicinity that can be entertained so staff recommendation and findings the recommendation staff provides is conditional approval first of all the setback variants should be limited to just the terrorists only not any further encroachment by any part of the building in the future for instance through an addition and also that the prop business owner make a concerted effort to investigate and if possible enter into a formal shared parking agreement pursuant to code to lessen the parking impact and what the code allows is within 500 feet of the subject property that i showed you they can enter into said shared parking agreement if feasible if agreed to by other property owners the findings are as follows basically again we're talking 0.6 acres of land the business operated with a temporary outdoor seating area much like what is being proposed and what i'm told is that there was limited operational issues in terms of access parking that kind of thing the zoning code allows for those shared parking agreements within the 500 foot distance criteria and the front yard setback variants should only be pertaining to the terrace and no auto parking stall loss results from the placement of the terrace it's the requirement that the terrace provides in addition to existing uses where that extra parking kicks in so they're not deleting any parking it's just it requires additional stalls many policies also within elevate las cruces a comprehensive plan lend support to the request and again no public input was received opposing the request and also the landscape fauna the softscape can be accommodated within the landscape areas but the landscape area issue needs to be addressed and that only represents the 12.6 percent of the required area and finally a couple more the action would not be contrary to section 3810k it does in this instance have the opportunity to provide or spur economic development at both the neighborhood and the city-wide level through the generation of gross receipts tax and also the variances would help bolster the business operation and allow them to continue to operate on site and thereby provide some retention opportunities oops so your options this evening commissioners is to vote yes and approve the variances as stipulated you can vote no and deny them please keep in mind that denial will require your own findings of fact and not presented during staff review you could vote with conditions the condition staff proposed was to limit the variance for the front setback to the terrorists only and to also require the applicant to investigate and if feasible enter into a shared parking agreement and if you agree with those could you please add those to your motion please and that concludes steph's presentation i believe the applicant's representative is in attendance and can answer any further questions you may have all right thank you is there anybody for the commission who has any questions for mr banegas i do it's not so much questions but actual gendering concern parking um i mean i've been to delicious quite a few times so familiar with the parking situation there and um i didn't i didn't know that they kind of gentlemen agreement shared parking with the funeral home behind them so that's good and i mean that's between them i don't think that's up to us to decide but um you know i mean i think the pandemic really brought a lot of issues as far as you know economics and business survival blah blah blah but this would you know definitely i mean hopefully attract more customers for them but i would just be really concerned about the parking situation so can we talk maybe just a little bit more about that i mean i know you said that requirement is 51 but we're lowering it to 41. um you know how i guess how would that affect existing parking and existing traffic and in there yeah so so the the proposed use in addition to the existing use the after you do the calculation it comes to a 41 auto parking stall requirement on site even as their proposed layout shows we counted up 31 legal stalls they showed two more but those were in clear sight triangles we had to exclude those so that does raise a question you know there's going to be 10 stalls that aren't available that potentially could be val of value in terms of parking considerations for patrons i think in terms of the definition of the property boundaries you know how they're laid out that kind of thing there's there's no opportunity to further increase parking on site so that's why staff propose the shared parking agreement to help lessen the burden they wouldn't i guess they could but they wouldn't necessarily identify ten stalls to be used by adjacent you know from from an adjacent property but maybe they can consider staff parking only or something to limit any potential damage or just you know trash or anything like that those were kind of some of the things that the funeral home to the north cited as a concern but they felt that it wasn't just staff it was you know patrons in general that kind of thing so it really depends on how they word the shared parking agreement between the two which we become a party to in that we receive that document and it gets part of the you know becomes part of the permit record but um that's really their only option i mean in terms of lessening the impact lessening lessening the load what happens if they don't get it then what you're approving is uh minus 10 stalls so 31. yeah is there any way that we can wait to find out if they can get this agreement i've talked to the applicant and and indicated that that's going to be an issue for us to to consider for them to consider at this point in time i think you could certainly improve two of the three three of the three one of the three variances without you know the others in tow but i would recommend taking action either way on the the variances as stated as presented keep in mind that the parking agreement is generally an issue again that's left to the building permit process so it's apparent that if they don't get this agreement and they go ahead and put in the terrace that they are going to be stuck with whatever parking that will be left and they will have to bear the fact that potential customers will be turned away because they don't have a place to park that's correct sherman that's their risk that's correct so that should not concern us well it it may be a concern but that's one of the issues that you have to weigh in the voting of that item isn't there isn't there a piece of property right next to it that's vacant yes there's there's currently if i could find it it's just bare ground yeah there's there's a couple of parcels right now this one right now it had a lengthy building existing building that was torn down that was the one demolished so that's an opportunity to check into uh and then over here they're gonna have to get a little creative as to how they use that triangular piece but there is an opportunity to possibly share parking there we have to look at code allowances to see if parking lots would be in allowed use and they'd have to pave et cetera but the possibility is there and and you also mr chairman if i may you also have other properties uh on the other side which yes you're talking about pedestrian crossings uh that's a concern but but there are other uh properties that could be considered other than just the vacant ones all right are there any other questions from the commission mr commissioner kaiser thank you chairman um just something to consider as we're having this conversation about parking cars don't eat at restaurants people do um there's there's a lot of parking along east amador you've got residents that are fairly adjacent to this this parcel um so you know i think uh one or two fewer parking spots is not going to be a deal breaker here mike my question going back to their current operating status um just to clarify they they did have outdoor seating were due similar to what's being proposed since sometime in the pandemic mr chairman commissioner kaiser yes they had a temporary tent much like what was seen elsewhere in other restaurant venues and uh operated it in a very similar fashion outdoor seating kind of thing and to our knowledge in the time that they've been operating that have there been any complaints or issues related to the lack of parking mr chairman commissioner kaiser i am not aware of any uh significant operational issues related to traffic or parking thank you um my last question going back to the landscaping piece if you go back to their proposal real quick so that that proposed ponding area that that would be essentially a catchment basin for runoff off the parking lot is that correct mr chairman commissioner kaiser that's what they're intending they were looking at putting a drop inland somewhere in this vicinity to capture water from the impervious surface here allowing it to drain through the pipe and into this ponding area but utilities concern was that there is a water line in this general vicinity and that that would not work in talking with the applicant today they indicated that that's for illustrative purposes only and that could be resized according to calculation impervious area calculation so it may not be that big and if it does change and we can pull it away from that water line it might work again a building permit issue but if if it simply does not work they're gonna have to find another uh area for that ponding okay so though if i'm reading this correctly that proposed ponding area as proposed is not counted in the landscape area is that correct that is correct so if that ponding area were to become some sort of a bioswale rather than just a rock or dirt hole in the ground could that count towards their landscaped area and maybe put them over the requirement mr chairman commissioner kaiser what we generally allow is some plantings on the upper portion of the pond and then down in the the lower depth uh since it collects all the the silt and the oils and everything else we don't uh allow plantings in there thank you has anyone else on the commission wish to speak is the applicant here and wish me to add something to this please come forward could you please state your name and let me sway you in please angel ramos do you swear affirmative testimony you're about to give is the truth or nothing but the truth under penalty of law i do please try to speak louder and clearly into the microphone so we can hear you thank you commissioner that's okay thank you i'm angel ramos architect for new republic architects we've been solving small issues in this restaurant for many years we troubleshoot these technical problems every day of the week and to dissipate some of the concerns that this particular property has the owner just acquired the property to the right of it in order to be able to accommodate uh additional parking so we're we're in the process of looking into that the calculations hasn't been done the proposed use of the neighboring property has not been defined but the intent of the owner to satisfy the requirements provided by mr vinegas are there and thank you for a nice presentation of our project the ponding area if need be can be relocated the civil engineer has given us options we have impervious surfaces that will allow for some drainage we're not obstructing percolation in our new proposed landscaping area of course we're dealing with situation where we're reacting or the building and the owner are reacting to situations that happened during the pandemic where more space was required to accommodate the same number number of people so some room to expand was required in some instances there was a need for outdoor parking and this is much better than having a tent in the parking lot so i hope that this makes this project being viewed in a more favorable light i know that timings are not always perfect but the intent to satisfy everything and the code is there let me just i just have to clarify something mr banegas please a few minutes ago i asked you about the vacant part parcels next to this restaurant that bare ground that's there now are you telling me that the applicant has purchased that land he now owns it is that what you said yes sir i found that about that information before coming to this meeting so that has not been presented to us part of the backup so really the question of parking now is not even going to be an issue if that's what he's going to use the property for i would assume that he would mr chairman if if that is indeed the case i wouldn't aware of that either but if they're going to include that as part of the overall circulation overall operation of the restaurant then that would satisfy parking is the owner of the of the restaurant here [Music] can he address and answer that question he mentioned it to me a minute ago before presenting that's the sole purpose well that's the purpose the main purpose of purchasing that property parking parking lots for those that have studied urban planning it's not a perfect solution some parking lots sit vacant and they create the heat island effect and other things so we're we're balancing the requirements of the city not overdoing uh being mindful of what parking lots are intended to do and um so i i think that we covered as best we could every every angle in order to make everybody happy for this project i myself are not concerned about the fact that i would be willing to grant the reduction in the number of parking spaces but it also makes it a lot easier for me to make a decision if i know that the piece of property on the side of that existing property that they have is also going to be used a problem for parking it makes it we're we're here to try to help bolster business it's good for las cruces it's good for the applicant and i think that there is everything that i would like to do to make sure that we can do that so if there is that intent of the owner to put a parking lot there then it makes the decision a lot easier on my part yes sir on our firm we we deal with the technical sides every day of the week but the owner and his business their service providers for the community i just waited in that restaurant for a few hours while the time to come to this meeting came and i was pleasantly surprised because there's there's people that work there servers that offered me a glass of water chips and salsa at no charge they didn't know who i was i didn't know that i was the architect i declined everything and still they brought me water and they are very pleasant so that's the culture of that company they're they're very accommodating they're looking to satisfy all the requirements of the law just the timing sometimes are not perfect but i can tell you for sure that these are people that are always doing the right thing well i think i can agree with that from what you're saying but i can't envision any reason to buy that other piece of property other than to put a parking lot there what are they going to do with it build another restaurant i don't think they would do that then they would really have a parking problem yes all right is there anybody from the public who would like to speak on this all right seeing none then mr banegas from staff mr chairman if that is indeed the case if they've acquired the property to accommodate some additional parking they would easily be able to accommodate the landscape area as well so really it narrows it down to the setback all right i have to ask you a question and can we make this approval on a condition that we that the property that has been purchased and will be used as a parking lot council chair commission can you please complete the question can we make our vote based on a condition that if the applicant has purchased that vacant property next to his current ownership of the land that he does now his parcel that he will build a parking lot there so you want okay so the condition is that you want okay you want to require him that he has to build a parking lot on the new parcel well i've been told and the car our commission has been told that he has purchased that land and i can't see for any reason other than to build a parking lot i don't know what else he would put there it would be permission to do that at this time i don't think that that that parcel is in contention and i i won't i don't think you can make a condition just based off of some other parcel that's not in front of this count board well that's been brought up by the applicant kevin catherine mr chair members of the commission i i would just caution you um to tie basically the the future of one parcel to another um in in this regard it could create some unintended consequences especially if the intent was to develop something entirely different perhaps there may be parking available for this or maybe not but it's too amorphous at this point in time to tie two individual parcels together in that in that regard all right thank you then i can only hope that that's what he's going to do as far as i'm concerned there should be no further discussion mr benegas anything else mr chairman uh i was just checking with mr ramos and and one option the commission can do is to either remove cons from consideration or simply deny the landscape area and the variants for the additional parking that removes the issue from the variance consideration they're still on the hook through the building permit process to accommodate that and in talking with mr ramos the way to solve that problem from the building permit process is to carry it out on the adjacent parcel so you get out of the legality of dealing with that parcel as part of the condition and it becomes an issue that has to be resolved and resolved at the building permit level well personally i think that as it stands i think it would work i think that they would have to deal with the problem by reducing the number of parking that they have that have customers coming they have no place to park they'll leave if he has bought this property on the side to put in a parking lot that certainly solves the problem so as far as i'm concerned i'd like to just leave it the way it is and if anybody has any questions or comments from my commission all right then i think perhaps we could have a vote so i need to i need a motion i'd like to make a motion to uh approve the variance uh for the the parking the landscape and the setback uh however i would like to eliminate the condition that the applicant have to seek out a shared parking agreement i think it's pretty evident in the last however long during the covet pandemic they've gotten along just fine i don't see any reason why we need to add parking to this section of amador right second is that acceptable and can we do that counsel okay so what what exactly is the board trying to do i would like to make a motion to approve the variants for the parking the setback and the landscaping however i would like to eliminate the condition that the applicant had to seek out shared parking agreement you want to eliminate that condition that he seeks out though okay that's correct i do not want i do not want the applicant to need to go through that okay that's fine that is acceptable in that case we do have a second then we need a vote board member guerrero uh yes based on uh site visit staff recommendation and the new information we just heard board member vega i vote yes based on staff recommendations um everything that's been shared maybe you could add 10 bike racks if they'll find some additional means of getting there board member smith hello yes based on staff recommendation and on site visit board member kaiser yes based on stack our staff recommendation and consistency with elevate loss cruises chair gordon i vote yes based on staff findings and staff recommendations i hope that this will booster their business i think that everything that they want to do is probably what i'm thinking they will do and my site visit and according to elevate las cruces again i vote yes so i think we have a 5-0 yes thank you 5-0 all right thank you thank you good night all right now we move to new business item 8.1 the 100 south church street variance request mr venegas you're going to do that also yes sir mr uh mr chairman vince madangas interim planner for the record i will be presenting this item it is a variance request for property located at 100 south church street case number 21v 00500126 current conditions are as follows the property is is currently vacant used to be a church use certainly evident from the church street side if you're viewing the property from that location otherwise it can be a little bit deceiving as to where it's located i'll show you a map and ariel in a minute that kind of proves that point the property is plus or minus 0.35 acres in size it is zoned at ddc ms which is our downtown development code the main street zone it is part of the casa lin casalinda acres 460 subdivision and the structure was originally built in a according to assessor records in 1965. so this is the subject property it is outlined in red here you do have your main street uh zoning along either side of main street this piece right here is part of the civic plaza so it is a civic zone and then you have downtown designated zoning along these parcels here which are adjacent to church street and you also have them [Music] along here outside the main street zoning boundary so it's a little different from the typical zoning that you see elsewhere in the city but nonetheless again main street zoning the difference between main street zoning and the downtown designation is basically they're using it still allows mixed-use retail an assortment of uses but it utilizes the building layouts and the size compatibility or criteria for buildings that are unique or typical of the urban core and that's kind of the difference between the two so this is the property shown in the aerial you can see that the northern half almost northern half of the property kind of appears as if it's open space if you will that's kind of where it gets a little deceiving this is the building footprint that is in question further down is the new america's new america school which is at issue with this variance request so the variance is necessary because our recent adoption of cannabis related regulations requires facilities that will retail cannabis related products to be 300 feet from where the sale of such product is in terms of the building footprint to the property line of a qualifying school and in this case qualifying school is pre-k all the way to 12. anything for adult education trade schools that kind of thing is not part of the criteria that they would have to meet a buffer distance for the new america school as indicated that is the one that the measurement was taken from the applicant is health nautics llc and it in talking with the applicant's representative and reading their their letter variance letter it became evident through through that communication that the business is in the business of selling health care product they do a lot of cbd related compounding of product and sale a product but they also deal with a little bit it sounded like a little bit the the applicant's representative could certainly clarify that but they deal with some product that has thc and that is the ingredient that that requires us to consider this this variant's request this is their not so much justification letter but their letter of intent in terms of the variance and what i glean from that is obviously they are a business that's seeking to provide quality health care products in this community and they do reference some job training programs primarily for areas or commun communities that are low income and otherwise absent of such programs job training programs that kind of thing this was the the site plan that i was given to show the relationship of the building again you can see the open kind of area here this is the building in question and so taking the measurement from the building footprint they're showing it at the building but the actual uh demarcation is at the property line uh that was where they got the 191.5 feet i rounded down to to afford them a little wiggle room should their measurement be a little bit off so that's the issue at hand a couple of photos showing the western facade of the property kind of one showing from the new america school looking north and from the subject property looking south public notice and input notice was sent to the surrounding properties and staff received one email a protest to date i distributed that email that letter that i received today to you all before the meeting they oppose the request it is from the superintendent of the new america school generally speaking you've read it or had a chance to read it but generally speaking they find that this use is could potentially be a significant distraction for their students that attend the school so staff recommendation and findings staff is recommending approval of the variance request the findings are that again the acreage is 0.35 acres presently vacant any allowance of the variants would help facilitate efforts to occupy buildings and retain businesses in the downtown area the zoning code although it doesn't allow manufacturing a product it does allow some limited compounding of product and so that zone is is appropriate for what we discussed we being myself and the applicant's representative the any subsequent building modifications pursuant to the development code or to their business practice will require proper permits and all such work will be made compliant at that time and there are many policies and actions within elevate las cruces that support the request again one letter and only one letter of protest has been received and this this request is not contrary to section 3810k which is the criteria for decisions because it does have the potential for spring economic development at a neighborhood in city-wide oops not wise wide level due to gross receipts tax generated by the the use so your options this evening mr chair commissioners is to vote yes and approve the request as presented you could vote no and deny and keep in mind that denial will require separate findings of fact not presented by staff and then if you have any conditions you wish to include you could certainly cite those as part of your motion for approval and that concludes steph's presentation i believe the representative is here should you have any further questions all right before we do that is anybody from the commission have any questions of mr panegas um i'm just curious because as we were talking about new america school being less than 300 feet i believe i don't know if they still have it right next door to this proposed property um or a couple doors next to it it's big brothers big sisters um i used to volunteer there they don't usually have kids there but do they fall under the same i guess category than the school does if mr chairman commissioner guerrero if they're not actually carrying out the activities of pre-k through 12 you know what you would typically see in a school then no i think i'm not quite sure what their operation does or how it operates but but from what i'm from what i know and what i'm hearing now it's it's i mean it's mainly offices but i was just curious if there was like the same issue thank you is there anyone else does the applicant wish to speak is is are you the applicant do you wish to speak sure come forward please good evening members of the commission you'll have i'll have to state your name and let me swear you in please daniel g buck all right do you swear affirmative the testimony you're about to give is the truth or nothing but the truth on the penalty of law i do okay go ahead as the sole representative of healthnautics inc and an economic developer by trade and someone who has worked extensively in the oilfield economy of southeastern new mexico as well as the northern territory of the state and trying to amplify the retention of business in the southwestern valley including dona ana county headed to sunland park in the el paso border the approval of this variance could do a lot for retaining the road map and the future of the downtown las cruces district which is on the correct trajectory with what the master plan has in implementation in accord with the city's ordinance we look forward to bringing a healthy and diverse trio to the downtown area that includes retail potential jobs as well as a need for the community in the mesquite historic district to be able to get a pedestrian access with limited car use to have prevailing opportunity as well as opportunities for postgraduates that are inhabiting that district all right very good thank you thank you does anybody have any questions for the applicant if not is there anybody from the public who wishes to speak i see you please raise your hands again four people all right we'll start over here on the left i will give you three minutes each please come forward state your name and let me swear you in my name is susie kimball all right do you swear or affirm that the testimony you're about to give is the truth and nothing but the truth under penalty of law yes i do go ahead thank you i serve as the governing council president for new america school we're not opposed to this type of business we're not opposed we know it's legal we know it's an economic driver we believe in this kind of business we just don't understand how you can easily make a variance on the 300 feet from a school because that variance is is designed to to protect our students to protect our school and what we're mostly afraid of traffic in that parking lot we'll share a parking lot on the back you're showing the front of the buildings now everybody in our school comes in on the other side so that parking lot is going to be full of people it's full of our students we have day school and night school so we're worried about traffic we're worried about safety and we're worried about setting a precedent if they can get a variance can everybody else so how many more shops like this are going to be within this range of the school that's what we're concerned about we're not anti this business we're really not we know it's legal we know it's going to happen we have students at our school from 14 to 21 22 years old we feel like this will be a disruption to our school to our community we oppose the variance we don't oppose the business but we oppose the variance because that's awfully close to our school and the other part i have to say about that is on the other side of our building is messier valley pharmacy they've told us they're going to seek a variance as well we share a wall with that place so how easy is it going to be to get a variance for other people as well that's what we're concerned about thank you all right thank you there's someone else on the left had one to speak again please state your name and let me swear you in my name is margarita porter do you swear affirmative testimony you're about to give is the truth nothing but the truth on the penalty of law i do go ahead thank you i'm margarita porter and i'm the superintendent of new america school las cruces um currently our building the owner is fyi families youth incorporated and they received the notice and they didn't give it to us we and we inferred with fyi about the notice and they said they never received it so that's why we only received um mr banangus only received one letter of protest because it we just found out about it just most recently and so i represent um 200 students their families and their parents um and so we again as miss suzy said we're not opposed to this we would just like for this to for you all to please require the 300 feet from a public school just because it protects us once municipal court is open all of the parking spaces are taken and we always have to make sure that that overflow parking isn't people aren't parking in our parking lot we have security guards who maintain that and so we think that this type of company would also create more traffic we're also concerned about there we already have a lot of vagrants in that area and so we would like to again maintain the safety of our students there are other real estate available for this type of company and we would just like to to maintain that 300 feet um because it's important to our families to know that their children are 300 feet away from on this type of of company and so i would just like for um the commissioners to please consider that to maintain the variance with a distance of 300 feet thank you all right thank you i think the gentleman on the right side again please state your name and let me swear you in mark viii all right do you swear or affirm that the testimony you're about to give is nothing but the truth on the penalty of law i do so just as they were saying this looks like a case of somebody made a mistake and they want the city to fix it there's a reason for that 300 foot variance i see kids walk by that building in droves by the front opposite side there where the parking is at just lots of kids walking by there i just don't think that that's a suitable place they said 300-foot for a reason i don't think it should be broken thank you all right thank you wait next gentlemen please please state your name and let me swear you in my name is jay wisner do you swear affirmative testimony about to give us the truth and nothing but the truth on the penalty of law i do it for thank you go ahead yes um i'm a retired juvenile probation officer and i'm also the pastor located in the church right here right next to the new american school you see that building with the three crosses on it right there so i did get a notice i didn't see on it an email maybe i missed that where i could reply to i got notice of the meeting and wanted to come and reply to that notice i don't believe we should give any variance either due to the nature of the business and i have a few things to consider one is and see being a youth advocate and if anybody from the school if i misrepresent anything please correct me just make sure you're speaking to the microphone so we can hear you okay as a juvenile probation officer i have placed youth in that school they are structured to the point where they can work with kids that are at risk i don't know if they have any at-risk kids there now they sure did when i was working with them i've been retired about six years now and i'm i'm telling you they do a great job and i'm here in support of what they're saying but i also want you to consider a few other things i have a study from a scholarly journal about the placement of cannabis ads and store locations and their impact their negative impact on youth i want to leave that with you if you would like to consider this i have a pile of studies to look at if you would like there are some very serious issues here once an at-risk youth become at what are they at risk for being system involved once their system involved a lot of them end up tethered to our our criminal justice system for years to come i'm speaking again as a retired juvenile probation officer i worked in this city as a juvenile probation officer for 23 years so i'm telling you if we have youth that are already at risk and they're in line of sight right the back of this building is where the parking lot is as the lady from the school represented that's where likely their customers will park they're not going to go around there's nowhere to park around front there's a there's a place for one or two cars up front they can't park back there and they're not going to walk all the way around they're going to use as we do the other side of that building as the school does as the entryway to that building i'm sure now what i'm saying is they're not only less than 300 feet but they are in line of sight of any youth in that parking lot from that school i have seen okay i've seen students walk just past right past the front of that building going home and so i would ask that you consider not voting for that variance i think it would be detrimental to our community all right thank you can i leave these with you to look at impact of marijuana use on youth particularly i have in my master's degree looked up i mean when you get when you get peer review could you please talk to the microphone because she's trying to record this my apologies when you get peer-reviewed studies these aren't just something that the marijuana industry pops out these are things that that our best and brightest minds come up with okay this and this is just not my opinion alone these are true academics that put these together okay i thank you thank you i think the representative from the applicant wanted to speak again i've already been sworn in so go ahead thank you thank you members of the commission as well as members of the general public who rose concerns about our building and the type of business that we're spearheading in the downtown arena health nautics is a very minimally teach based thc based company our products are organic and aimed at aiding high risk individuals that suffer from ptsd um regrow their inner being and their spirituality as well as their mental instability we currently work with veterans at fort bliss with our products they're held in medical professional offices within the community we also work very closely with people who are vagrant we have job opportunities that come about and we work with previously incarcerated individuals to offer job training programs and reinvention into society as we know those are heavily stricken populations and minorities that gather in our community with homelessness on the rise and i think that the school before us is not reconciling the plan that we offer a retention room when people come in on the south side of our building we will have a check-in area it'll be guarded code locked and key secured it will be monitored by an employee who's trained you'll have to turn in your credentials that state your age your licensure for buying and then that's how you gain access to the showroom it's not as if a student or a minor could walk in and go buy a product off of our shelf as well we can operate under hours that coincide more helpfully with the school district and i'd like to keep in mind that you know churches are a wonderful asset to our community schools are a wonderful asset to our community but an age group that struck me from the new america school that was presented was 18 to 22 and by statement of the federal law 18 is when you can start making decisions for yourself you're considered an adult so i don't see how that can play into the ruling for designation on main street nor can i see how bars that operate just an additional 100 feet from our building until two in the morning who had previously had victims of crime in the evening play as a unilateral blind spot to the business that we're in trying to help downtown one of our facets to bring to that building is a multi-use district not only will we have retail but a potential food desert offering for the mesquite historic district as well as the alameda district and i was appointed last tuesday for los esperanza's inc as the liaison for the three districts main street commercial the alameda district in the mesquite historic district i'll be leading the community watch as well as helping intervene on crime and i would really like to work closely with our our community downtown that's including the school the nonprofits fyi and the churches do you know what the hours of operation will be uh that can be determined by this meeting with the contingency i just have a comment which is it's just it's sort of i just can't if this if this facility had been with had been more than 300 feet away this this meeting would not have been necessary and your complaints about let's say it was 320 feet away you have a big church between the facility and the school there is a buffer there is a religious buffer i know from my friends who have have cannabis licenses from the state go to these facilities and i know that when they go there they have told me that when they go in they have to give them their license they have to give them their cannabis license and they're taken in individually nobody can go in with them they buy their product they come out they can only pay with cash you can't even use a credit card it's very well controlled so i know what you're saying and i hear what you're saying i also hear what people from the school are saying and the church i appreciate your comments [Music] these are just my comments it's very difficult considering the fact we're only talking about 110 feet here whatever it is it's not like we're talking about the building right next door so if anybody else from the commission has any comments or any questions [Music] commission vegas um i think this is for staff is the 300-foot variance the same for an establishment that sells alcohol mr chairs commissioner vega we believe it's 200 feet i'd have to look that up but if my memory serves it's 200 feet uh just to clarify it is actually 300 feet there are some additional um requirements for alcohol licensing it's 300 feet from a school a church a daycare and i believe parks and other public spaces if i'm correct okay thank you commissioner smith yes um i'm uh very sensitive to the the public people who are opposing um you know this variance but um i've resided downtown for you know almost 22 years since i've moved to las cruces i'm very familiar with the downtown area i've watched it you know revitalization over the over the past decade and as the applicant stated you know there are a number of bars surrounding this area very close to the new school you know yes this building is less than the 300 feet required but you know them walking by this building the way this building is going to be established i i don't see how it will have such a negative impact on the students especially with the statement about the age of the students 18 to 22 at night bars are operating at night and they're eligible to walk into a bar so if that's not an issue i have a difficult time understanding how this building could be an issue thank you anyone else commissioner kaiser uh the the ordinance for this type of establishment 300 foot buffer how would that play out in the totality of the downtown area in other words was the intent to exclude these establishments from downtown because i assume that new america has been there prior to the establishment of the ordinance so just curious if there was what the intent behind the ordinance as it stands now chair members of the commission uh commissioner kaiser there was no intent to exclude these types of uses from downtown there are some other areas downtown that are far enough away from the new americas school the intent behind that was to be consistent essentially with the state regulations regarding the alcohol distancing that's really what that was about thank you but it is true that there are establishments that serve alcohol within 300 feet of this new america school correct i can't speak to the exact location of those licenses i do want to point out that the 300-foot rule is a state rule specifically for alcohol while we look at that as part of our process the zoning code actually doesn't speak to 300 feet specifically for alcohol but because that's not outlined by that was not outlined by the cannabis process it's something that we added to our codes just just for consistency thank you anyone else well in that case i guess any further comment thank you members of the commission all right thank you i guess that we're ready for a vote oh yes sir come on i don't i will allow anyone to speak since you've already been sworn in just please speak right into the microphone yes my name is jay wisner the children the children that i saw walked past were at it was at 4 30 in the afternoon and if you go any normal school day i don't believe they meet on fridays you go on to other school days and you'll see children not adults walking past the facility and the issue is if the people buying right there whatever the product is are going to be parking where the children are walking by there's potential for contact right there that's the issue that i see and so what i'm just trying to cross some of the t's and dot some of the eyes here says your comment you think is directed the fact that so many children maybe get hit by an automobile is that what you're saying no i didn't misunderstood you the way children get a hold of drugs and alcohol as adults give it to them and so there's potential there and there's potential since you have adults that go to new american school with children as well and i'm just trying to you know i think in in the conversations we're comparing apples and oranges and i'm just trying to line up the apples with the apples and oranges again it just seems to me though that if this was beyond 300 feet our discussions here this evening would not be well we wouldn't even have known that they were going to be there that's for sure i did i wasn't aware and they're well within 300 feet of our church i wasn't even aware that they're going to be there we never got to notice that the business was going to be there to begin with until we got this variance notice never got anything like that so that's the only reason i'm here today is because i didn't know about that until the variance notice all right thank you that's all i have to say thank you dave can you comment on that if necessary [Music] yes mr chairman members of the commission in terms of the criteria regarding the distance and and variances the ordinance that was approved does qualify uh the allowance uh with the 300 foot buffer this does not meet that so therefore it does allow variances to be considered variances by their very definition should be justified have some demonstrable hardship associated with them that's the typical criteria by which a variance is is considered in terms of development cases such as the variance or zone change or any of the others that we entertain the code is very clear we notify property owners as identified by the dona ana county assessors office and so that's part of the dilemma that new america school faced the landlord fyi inc received there i checked this morning they are on the mailing list so they should have received one if they did not then something's a miss but we did send one out and in terms of churches they're not part of the criteria for notification for distance consideration all right thank you mr smith i have one more comment to make go ahead i once again i stated that i live downtown i'm very familiar with this area and just to the south of the new america school is a new pharmacy within a new pharmacy they have over the counter medic medications and the students at the new american school have much easier access to these over-the-counter medic medications then they will have uh accessing the healthcare products that will be sold at this at this health natick facility i'm once again very sensitive to your concerns but i i i must state that the access that the students will have the danger that would be posed to them is actually much less at this facility than it would be at the pharmacy that is literally right beside your building actually also i think it should be noted that you can buy products on the open market that contain cbd which do not have the amount of thc that you will find in cannabis that is sold in a licensed establishment by the state with a cannabis card so all right then can i have a motion please someone make a motion to approve i'll second it board member corrado so i'm i'm actually going to vote no and the only reason i'm voting no i mean i completely agree with this kind of business um i agree with my commissioners as well but um i am concerned about what the school said about the business next door or pharmacy next door saying they're going to seek a variance as well so i'm only voting no out of principle because i don't want this to be something that is just expanded to everyone and just be like oh we can just go and you know they'll let us do whatever we want so i'm voting now board member vega um i i vote yes based on um information shared today site visit having some economic growth within the community and the fact that i do feel that there is some stigma attached to marijuana products that we don't place on alcohol there's plenty of establishments that are in this downtown area that will continue to come in that will probably seek the same type of license so i vote yes board member smith hello yes based on site visit staff recommendation and also just having an understanding of what this type of business could bring to the downtown community these type of facilities and businesses are being established all over town and i don't think that the impact that it's going to have to the school it's it's going to be of a dangerous level i think it's going to be minimal board member kaiser i i am concerned uh with the precedent that's being set here um i wish there was some additional thought put into the buffer distance in the downtown to begin with that being said these are the types of uses that are consistent with downtown and i think it's consistent with elevate las cruces and i agree with staff's recommendations i'm voting yes chair gordon considering the fact that variances are allowed and we're only talking about 110 feet here and if it was the 300 feet or more this would have been a moot point i think based on staff recommendations in our discussion and my knowledge of what i think is the business and it's going to be the business of the future it'll be a big business here in new mexico in las cruces and in the country if they can legalize a lot of this i think a lot of the illegal stuff will go away and you i can tell you from my friends how beneficial this is it's unbelievable how people have been helped through the use of legal cannabis so also again it just brings another business into the downtown area and i think that there will be no effect i think that the school is should not be worried about this i don't think it's going to be a problem and for that reason i do vote yes approval 4-1 thank you okay then we move to the last two items on the agenda item 8.2 and 8.3 which is the the settler pass master plan and the preliminary plot again like earlier this evening i want to be able to discuss these items together but we will vote on them separately so can i have a vote to to do this please yeah i'll make a motion that we discuss 8.2 sorry items number 8.2 and item number 8.3 together but they're voted separately commissioner smith that's a second board member guerrero yes board member vega yes board member smith yes remember kaiser yes chairman gordon yes thank you go ahead good evening mr chair members of the commission my name is john castillo i'm a planner with the city of las cruces don you're going to have to talk me better into that microphone sorry my name is john i'm with the city of las cruces in planning today we're going to discuss the arroyos at seddler's class master plan and the arroyos at settlers pass phase one preliminary plot current conditions of the property today it's located west of settlers pass also known as longview lane it's east of the future extension of rinata boulevard and north of the rincon hills subdivision right now it's currently located in council district number five it's approximately 45.98 acres and it's currently zoned r1b which is our single family high density zoning district as it sits it's a vacant undeveloped tract of land uh here's a aerial map of the property we can see the zoning map here the proposal for the master plan is to subdivide the four existing parcels into two phases it's going to bring 205 single family lots attract for drainage and utilities and it's also going to provide a 2 acre lot 2 acre park to the city of las cruces as it sits right now it does meet the requirements of the subdivision code the design standards and the 2001 zoning code it's also supported by elevate las cruces and it falls under the suburban place type neighborhood the proposal for the preliminary plot or phase one is to subdivide the three existing parcels the one near the future extension of rankinada boulevard and the two south of the larger one that we can see right here so these two and this one are part of phase one they're going to bring a 114 single family lots and one tract for drainage and utilities this is uh the master plan as it sits these are the surrounding zoning designations and parcels and this is phase one of the arroyos at settlers pass a public notice was sent out to all relevant agencies they all have supported this preliminary platinum master plan notice was also sent out to surrounding properties at the time of the presentation was being created staff did not receive any phone calls or emails regarding questions on the development this was also sent to our development review committee on january 19 2022 they review subdivisions from an infrastructure utilities and improvement standpoint there was discussion and the drc did recommend approval of the proposed master plan and phase one of the preliminary plan staff recommends approval for the master plan based upon review by city relevant city staff the proposed master plan does comply with the requirements and standards of the city las cruces subdivision code the proposed residential lots comply with all requirements of the 2001 zoning code as amended the subdivision is also supports and meets the intent of elevate las cruces comprehensive plan and as stated earlier it was approved by our development review committee or drc staff also recommends approval of the preliminary plot based on similar findings today's options are to vote yes to approve vote no to deny vote yes with conditions or vote to table the representative is also here to answer any questions if necessary thank you anybody from the commission have any questions mr kaiser a couple of questions for you um and the department review comments um i did not see active transportation uh listed there um so at the time of this we don't have an actual specific workflow or review process for our active transportation coordinator in our permitting software it is something that we are working on but they have reviewed it he did provide comments regarding the drainage tracks being used as multimodal system access points which i did talk to the developer in regards to that and we have rectified that issue okay that actually leads right into my second question about that so in phase one uh looking at oh yeah there you go um so i guess i can't really point but it would be the west northwest corner of that cul-de-sac no other direction there you go how would those residents access that future park that they share a border with mr chair commissioner kaiser there is and i know it's a little difficult to see on this one but there is a tract right here that is dedicated as a 10 foot drainage access track also a multimodal tract as well okay thank you yes i definitely did not see that um continuing on that line of uh thought uh how would this relate not only to uh phase two but also phase three it appears that there's additional development that's going to happen to the west of that cul-de-sac why would there be no connectivity there mr martinez would you like to my name is edward martinez representing zia engineering and environmental and i'm representing the applicant all right let me let me swear you in then please do you swear from the testimony you're about to give it the truth and nothing but the truth under penalty of the law i do thank you go ahead yes commissioner kaiser chairman gordon the phase three four area right now is optioned and not actually under ownership of the developers that's the reason it's not part of this application at this time however we have done a fairly substantial amount of work in master planning and conceptual design of that area and had quite a few meetings with city staff not only specific to phase one and two that's before you now but also incorporating what we hope to happen within phase three four uh within the phase two area just above that cul-de-sac that you pointed out uh is where the two-acre park is proposed to be that will is part of this master plan at this time within the phase 3-4 area we're going to be adding an additional acre to that park area the reason why we don't have direct connectivity between the that cul-de-sac in the phase three area is actually because of the differential in grades at that point in time we're going to have actually retaining walls along the west side of that cul-de-sac at that area however at the area of the park we're actually along the ridge line at that point in time so the grades are much closer in elevation so we'll be able to tie the acreage of the park together without retaining well separating the the current area that we're under master plan versus the future area thank you for that clarification yeah that definitely does not come through in this plot uh plan so i appreciate it um some other questions on access so the the proposed i guess temporary access off of um uh was it wakanda marine canal boulevard yeah so if that's only temporary at some point it's going to disappear so how would residents of this neighborhood this development access the future commercial development that would be to the northwest of them it appears that if that temporary access were to leave they'd be forced to go all the way around to the east and then back around thank you commissioner kaiser chairman gordon um the temporary access that we have now that we're proposing now is simply based upon the ownership that they have in place now the land that they're optioning and the area that we're master planning for future phases three and four will actually have a permanent access point that will be approximately 300 feet north of where we have the temporary access coming out to ring another boulevard so they will have direct access to rank and now the boulevard the reason why this is a temporary access where we're proposing it now is because of the current geometry of the parcels that they own the ponding area that's located there now and the existing park hill drive we can't directly line up that intersection that we're coming out to park hill drive so because we can't directly line it up under the codes the codes don't allow a offset intersection with arterials and collectors so that's the reason why we're going to be doing it as a temporary access now it'll be a paved access but it'll be temporary and then when they move on to phase three which will be we anticipate probably in within about a 36-month window we'll close off that access point it'll turn into either a lot or ponding and then we're going to move the permanent access point about 300 feet to the north thank you uh just a couple more questions i promise um i i've been here all night so i'm here as long as you want oh yeah i'm sure my colleagues are anxious to go home too um so uh bike lanes i'm going to ask it are they proposed where they proposed there's currently no no bike infrastructure on the boulevard to the southwest and then on settlers pass it's it's inadequate bike lanes this is obviously a big development and is only growing so i wonder if you can speak to that a little bit more yes commissioner kaiser chairman gordon i'm a bicyclist myself so i'm all for bicycling um at the same time unfortunately there's it's always a challenge to try to get everything to fit in and the quite frankly the codes of the city are not super friendly to trying to get everything to work out at times to get the everything in that we would like i actually had proposed to do a multimodal pathway within this development and because [Music] challenges with trying to get it worked out as well as quite frankly another part of it that the pressure that we're dealing with is the the market that this development is trying to hit is within like the 200 hundred thousand dollar home market and so because of that between the pressures of trying to keep costs low as well as trying to meet city standards we weren't able to make that multi-modal pathway work out within the development however i'm we are proposing to [Music] pave as part of this uh actually as part of phase one we're going to be paving the eastern half of rinconta boulevard from where it ends now up to our temporary access i'm hoping that in the detailed design of that we'll be able to perhaps shrink up the median area within our proposed section and have a multi-modal pathway along the eastern side of rinkanatha boulevard and then as we extend rinconada boulevard to the north through phases three and four when when that's developed we'll extend hopefully that multimodal pathway at least to the end of our our development well if that is in fact true that getting a multi-modal pathway built through this development uh it didn't happen because it was too difficult that's deeply disappointing it is these things aren't these things aren't hard to do if you prioritize it uh and i guarantee you building a bike lane is a heck of a lot cheaper than a four four-lane artillery road when you look at the per mile cost so that is disappointing to hear but i'm encouraged to see that you're finding other ways to incorporate that just i hope that we can work with staff to really maximize that opportunity people who purchase houses for 200 000 deserve bike lanes no more or less than anyone else in the city it shouldn't be reserved for the people who buy into million dollar developments million dollar home homes like this is a this is a basic mode of transportation that should be available for all income levels um my last question i promise uh on the [Music] uh the multimodal pathway access that sort of cuts through the development i also notice it's intended to serve as storm water drainage but i also noticed on one of the the maps that was handed to us in our packet that they're proposed to be entirely paved as concrete i would hope that there's an opportunity here to look at something other than concrete it is not beneficial in any measure of the term from a stormwater perspective it only increases impervious surface so i'd like us to find ways if it's possible to incorporate some permeable pavers in those sections i've seen how some of these things are developed throughout the city and quite frankly i don't know who would want to even walk through there it's just basically an oven in the middle of the summer when you're surrounded by concrete but so i just would kind of open that as i don't know if that's a question for staff if that can be something that can be a condition here but i think that's something that we should seriously look into there's policies in the comprehensive plan that point to things like this and developments yes if i may commissioner kaiser chairman gordon i generally fully agree with with your comments once again one of the challenges however is a lot of the pavers are not necessarily super friendly for ada compliance and we also have to meet ada compliance within those those uh sections so that's that's one of the challenges in trying to get to that that to work out yeah i just encourage you to look a little bit deeper into that because it it's possible i've seen it um it's it's not a groundbreaking way of developing um for stormwater so something to think about agreed anyone else i just have one comment apparently there is there is going to be one other accident enter point on longview is that correct another way in and out uh uh chairman gordon uh yes it's uh on longview it's actually designated i think is settler's pass but yes and we're going to be paving the western half of settlers pass through this development okay thank you thank you after no other questions anybody from the public wish to speak sir please speak your name my name is bruce brown and let me swear you in please do you swear affirmative the testimony you're about to give is the truth or nothing but the truth and the penalty of law i do all right go ahead i'll give you three minutes i own the northeast corner of the end of settlers pass where the solar panels are so as settlers pass goes up and basically when the pavement ends there we have a concern rincon hills all ever 200 plus homes all exit onto settlers pass from what you're telling me there's going to be one exit at the bottom and one exit at the top one on settlers pass one on ring canada when it's finished and there's a lot of a lot of traffic so that's one concern i have okay okay another concern is at carson the development that is north i think it's called carson ranch or further up the blacktop is going to have three posts because the four wheelers love it out there is there going to be a similar consideration at the end of the blacktop when you do settler's pass okay okay very good um the other thing is is is there will the city is it gonna consider patching or filling in the two blacktop areas that will now be in line because i can guarantee the private owners are not going to pay that third of a mile let alone with the utilities and all of that well we can't answer that question you'll have to direct that to the city so one of my questions too is at the end of settlers pass longview technically turns left and then again turns north depending on what plant you're looking at are you all going to once you do the blacktop on sellers pass are you going to continue the blacktop on a minor arterial on longview i think that's all i have thank you sir i thank you you'd like to reply to that thank you and if i miss a question please let me know [Laughter] uh regarding the uh where we terminate we'll be terminating the pavement we'll be terminating the pavement at our northern property boundary on settlers pass we're actually going to be at this point in time the 42 and a half feet of what will be the western side of settlers pass is currently under ownership of this developer the developer will be dedicating that right away as part of this uh plating and uh and will be making the improvements along that that section for our quarter mile basically where our land terminates to the north of there [Music] it's currently owned by someone else we don't have the permission from that individual to extend payment through his property nor quite frankly other than transition would there be any requirement or necessity to so what unfortunately is going to happen and it happens oftentimes throughout the city is we're going to have we are going to end up with a little bit of hodgepodge of payment as you're going through settlers pass there you're going to have the fully paved section through rincon hills that currently exists you're going to have the half section on the west side where our development exists then it's going to transition back to gravel on the east side which is where the right-of-way currently exists for the next approximate i think it's a quarter mile and then you're going to get to pavement again farther north where there's another planted subdivision up there where right away has been dedicated so you are going to end up with a little bit of a hodgepodge which unfortunately we don't have control over that's one of that's one of the problems of development we understand i understand that your concern hopefully sometime in the future it'll all be done so specific to your question yes where our pavement ends there are going to be what we call chevron signage on the where the pavement ends on the west side but we're going to be having a tren a gravel transition back to the east side to get back to where the road is currently sure if someone could explain the phase one phase two phase three which which is which and four that i had not heard according to the paper that was you know mailed to my house can you go to the zoning map that's good yes chairman gordon if i may our phase one area essentially consists of this area that i'm outlining here which is the southern 20 acres of this 40 acre parcel and then a portion of this six acre parcel here to get back to rinconata boulevard phase two is this northern 20 acres here of this 40 acre parcel the land that they currently have option consists of this acreage to the west in this area here and within that area it's broken into what we're identifying would be a phase three area which would essentially to a large extent consist of the northern portion of that parcel and phase four would then consist of this what i would term this inner area of that parcel area as well okay thank you well if there is nothing else i think we are ready for a vote remember we are going to vote on each item each eight eight two eight point two and eight point three separately so can you please someone give me a motion for 8.2 for the master plan commissioner smith i vote that we vote on 8.1 of this master plan the commissioner had all seconded it board member guerrera yes based on a by or sorry site drive and uh recommendations from staff board member vega vote yes based on staff recommendation board member smith of all yes based on staff recommendation also board member kaiser voting yes based on staff recommendation consistency with elevate las cruces though i do encourage the applicant and staff to work on some of the issues that were raised here chair gordon i vote yes based on state recommendations and consistent with elevate las cruces approval 5-0 thank you all right then now i need a motion on the item 8.3 which is the preliminary plot uh yeah commissioner i'll move for approval of 8.3 a second board member guerrero yes based on the same reasons for the previous vote for member vega vote yes based on staff recommendation board member smith oh yes based on staff recommendation board member kaiser yes based on staff recommendation and once again encourage staff to work with the applicant on the issues raised here chair gordon i vote yes based on staff recommendation [Music] uh approval 5-0 thank you all right then that takes care of all the items on the agenda we are now looking at uh did anybody on the commission have any comments this evening if not how about staff announcements thank you mr chairman and commissioner larry nichols for the record i just have one comment to make it's really an upcoming notice for you there's going to be a presentation on the re to the city council on the recent census that was taken it'll be a census report and uh if you can we'll make sure that you get the dates for that so that you can listen for that reason being is a lot of information that census has a direct bearing on items that come before the commission here in the planning and i think it's a very interesting some of the metrics that we found in there that's all mr chairman all right then i'd like to get a motion to adjourn it is now i guess quarter tonight make a motion to join i will second that we will join thank you you