You're live. Good afternoon. Welcome to the Las Cruus's City of Las Cruis's work session. Today is Monday, February 9th, 2026. It's approximately 100 p.m. Mountain Standard Time. I am John Munoz, Mayor Prom. our uh mayor will be in shortly. Uh let's start with a moment of silence for the brave men and women of the United States Armed Forces as they protect our interests around the globe and our courageous men and women of the Lustrus's Police Department and Fire Department. Please join me in the pledge of allegiance of the United States of America. and to the rep for it stands nationy andice for all. All right. As we begin the the meeting, um I'll take a motion if someone would move to allow Councelor Beno to participate via Zoom. So moved. Second. Moved and second. This is on the motion to allow councelor Bencomo to attend the meeting via zoom. Councelor McClure, yes. Councelor Matise is absent. Councelor Harris, yes. Councelor Ben Ko, I don't think she's on yet, so absent for now. Councelor Karan, yes. Councelor Munoz, yes. And mayor, did you want to vote on this one? No. [laughter] Perfect timing. Yes. All right. Motion carries. All right. I'll turn it over to the mayor now as we go into jobs of the week with Sarah. Thank you so much. Good afternoon everybody. My name is Sarah Rainey and I'm the onetop coordinator for the Southwest Region of America's job centers. For jobs of the week, we have a utility service worker for the city of Los Cusus starting at 1807 an hour. That posting closes on the 23rd. We also have a public works inspector for the water wastewater department starting at 2379 an hour and it closes on the 16th. We have a sales rep um the relief large grocery mass merch merchandise for free for 2820 an hour starting that one closes at um on the 6th of March. We have an institution liaison and receptionist for Pinnacle Institute. That one starts at $15.90 an hour and closes on the 22nd. A commercial driver, part a part-time commercial driver for AutoZone, depending on experience is what they pay. And then it ends in March. And then a medical intake specialist for Delva physical therapy and hand therapy starting at 33 a year. And that one closes in March as well. Just a reminder, um we have our mockatilia rocket where we have all of our local juniors and seniors come in and practice their interview skills and get a little um practice on presentation of themselves, asking questions, and just presenting themselves professionally. We are asking for volunteers. We have had a couple of the city council members sign up. So, thank you guys so much for doing that. It's really exciting. Um, these juniors, juniors and seniors really look forward to this and it's really eye opening for them. They get really nervous for the first interview and we encourage them to have three of them. By the third one, they think they've got every job they're going to apply to. So, [laughter] we like to give them that practice and let them, you know, experience it in a practice setting. Um, and then just a reminder, every Monday we have ALPS in our office. They are doing onboarding in our office from 9:00 to 2 every Monday. So come in, check that out if that's something that you're looking for. And then on the 25th, we have an employer in office meet and greet where we have um different employers from our local area come in and present their opportunities. So if anybody's interested, feel free to check it all out on employee&mm.com that has all of our um local events and then the events throughout the southwest as well as our social media. So thank you very much. Thank you, Sarah. Next is the agenda item 3.1, the proposed GRT priority projects. Uh, Chris Favor. Good afternoon, Mayor and Council. Hello, I'm Chris Faber, community development director. Okay. All right. Good afternoon, everyone. So, I thought we would pick up this discussion right where we left off the budget retreat, [clears throat] which was a discussion about the pay as you go funding and then a decision that seemed like there was consensus around as far as the bonding goes to put 60% of the bonding um money towards maintenance projects and then 40% towards new projects. So starting from that point, I did want to go back in and just kind of give a little bit of a of a overview on the GRT um and just kind of, you know, just provide a little bit more context. So we started collecting the funds last year. Uh we're generating about 1.1 million per month. And so between when we started collecting and June of 2027, we'll probably bring in an estimated about 24.6 6 million. For the bonding portion of it, there is an $8.8 million um debt service payment and that will allow us to tap into about $20 million every two years. That leaves about $15.8 million in what's called pay as you go and that's basically the GRT funds that are not obligated to the bond debt service. And then moving forward beyond um July of next year, basically into FY28, you're looking at your bond debt service. And then roughly, you know, the remaining balance there that could go towards pay as you go. But I do want to caution everybody that that 4.4 is just an estimate. It could go up or down just depending on what those collections are, but the debt payment will be roughly what we are obligating to there. So, the first things I wanted to talk to you about were the pay as you go project. And so, a bulk of that could go towards deferred maintenance of city facilities. Uh, you know, right off the bat, there's $8 million [clears throat] needed for roofing projects alone. So, there's a there's a wide variety of projects that could be funded. Um when it comes to those facility maintenance projects, another top priority project, this was a street project, but that's to redo the Hogland Alama intersection there. Um and then putting $5 million towards five fire department apparatus and then $5 million towards both vehicles for the police department and a portion of that towards the driving track. I believe Chief Daniels talked a little bit about the fire apparatus at the budget retreat, but basically, you know, there was a few years where we didn't order um some of the apparatus that were needed. So, this is kind of making up for some of those years that we didn't. And similarly for the vehicles in the police department. So, moving on to recommendations for bonding, specifically the 60% that would go towards maintenance. That works out to be about $12 million. Recommendations here are $5 million to go to fire station one improvements. Anything from the heating and cooling, plumbing, utilities, re-roof, there's there's an extensive list of improvements that need to be made over there. Uh we're also recommending $4 million to go towards general street maintenance. Uh this would be for projects that are you know part of the pavement condition index program which determines which streets need to be priority and and what sort of processes need to be implemented to deal with the conditions uh on those streets that have been identified. We're recommending 2.4 million to go towards public safety fleet upkeep. This would be over two years and this breaks down to about $600,000 per year for each police and fire and that will allow them to keep up with fleet maintenance so we don't fall behind like we've done in the previous years. And then the balance of that we are making a recommendation of $600,000 for additional facility maintenance specifically towards ADA compliance on city facilities. So, moving on to bonding the 40% new projects gives us about $8 million. And I've just listed several projects that were kind of priority that have been identified through the process. Um, again, putting more money towards road reconstruction, uh, money towards the joint public safety training facility, uh, $2 million towards Bruin and Motel Road improvements. in that project specifically is if parks moves forward with either a park build out of the land that they purchased over there or some sort of a recreational facility in that area. Uh improvements to that road would needed would be needed to handle the additional capacity. Potentially putting some money towards municipal court design. public works has worked up kind of a loose estimate of how big a facility would need to be roughly 25,000 square feet and based on the going rate for um you know designing construction per square foot you're looking at about 22 to $25 million for a new municipal facility you could put money towards starting that design process um again additional park projects there's there's a long list of park projects that could use funding so you could put money there again there's also a lot of um current projects on the CIP that that could use specific um funding to fill some of those gaps. Maybe they just need a few hundred,000 to complete them. That could be money dedicated specifically to checking off some of those and then putting money towards the Angler Road extension. Overall, that's about a $24 million project, but I think there's some interest at the state level to maybe kick in some money. So, if we were able to put some money towards that, um that could possibly, you know, get us more money uh from the state level. So that's really the last slide I had. I kind of wanted to leave it on this slide and sort of turn it over for discussion amongst council. Really what we kind of need today from a staff perspective is we need to get some consensus on pay as you go projects and then the bonding projects in order for staff to move forward with you know budget adjustments and other things. So if we can come out of here with consensus on all those areas or some of those areas that would be very beneficial towards the process. So I will stand for questions. Yeah. Thank you, Chris. Uh, council clerk. Thank you, mayor. Um, [snorts] I know at the budget retreat we talked a little bit about um traffic calming and I felt like there were a couple of places where that might go if that is in new projects sort of under re road reconstruction or is it under streets maintenance? But I think all of us kind of spoke to the need for traffic calming and where we can kind of enable that with either new funding or but I I would also say just to wrap my little area up here. I think the MUN court's important. I think parks design is important and I also think closing out some of the current CIP things where we have projects that we can kind of do quickly kind of goes along with what I was saying too with the budget retreat. Thank you. Councelor Harris. Um, thanks. So, yeah, I would also like to make sure that we get something for parks on it. I think that was in the language of the of the measure to approve the GRT. Um, and I'm also in favor of closing CIP gaps. And uh also wanted to remind about traffic calming because that's a big important thing to me as well. And actually I guess if you could maybe remind us all and members of the public what kind of what the language was when we approved um this GRT increase. Certainly, Mayor Councelor Harris, I believe it was, um, you know, funds dedicated to capital improvements specific to, um, parks, street improvements, uh, and public safety, and then other public facilities as well. So, it it was new capital and maintenance that kind of covered that broad range. That's not exactly the language, but those were the major milestones within the verbiage. Yeah. Thanks, um, Michael Harris again for the record. Um, yeah. I just want to make sure that we're we hit all of those things. Parks, public safety, street improvements. Um, since that's what we we asked people for. Um, that's what they said we get. So, we should do it. Council current. Sorry, Mayor Promos had his button on. Okay. Um, thank you for this. I um also want to speak to the the Bruins Motel Road. I know that rec centers were a large overwhelmingly supported component of the um public input sessions that we did uh as well as our commitment to focusing on things with youth. So, for me, the I really want to speak to the Bruins Motel um specific road improvements as they gesture toward a future of a rec center or a significant park buildup in that area, which I think is historically underserved um for with parks and recreation opportunities. And I would also add the Ingler extension I think is um somewhat specific to my district but also a huge kind of demand and uh corresponding um investment that the New Mexico Department of Transportation will be making related the the Anglr interchange is supposed to start in 2027. Um, and so that and people in my district, the the single biggest thing aside from uh neighborhood traffic calming, which I would also say is is the thing that folks are looking for is the uh increasing danger of having a large population that has only one ingress and egress. And I think I've heard this from the fire department as well and and they're thinking about um the East Mesa specifically. So I just wanted to speak to that angler gesture toward a large project that I think we should be investing in that that we can um magnify the money related to that. So uh other than that I echo what a lot of my colleagues say, but I do want to elevate rec centers as the thing that many many people in the public mentioned and I think um the Bruins and Motel road improvements is where that appears in this new funding. So, I hope we can consider that public input. Councelor Bencomo, if you're on Yes, I hope you can hear me. My Wi-Fi is very bad. So, is can folks hear me? Yes, we can hear you. Thank you. Um, I just wanted to clarify, are you asking for further guidance at this point? because I can also share some thoughts. I just I wanted to clarify um what the ask is right now. Mayor Councelor Ben Como, yes, we are we're looking for for further direction. If you have other items you would like to discuss as well, by all means, these were just recommendations based on some of the information we've pulled together during this process. I understand. Thank you, Chris. I you know I really appreciated that staff taken um you know at the budget retreat being open to the 6040 switch for you know maintenance and existing infrastructure versus new infrastructure. I think from what I see certainly in the city, I've said this before that there is a clear infrastructure emergency and so that needs to um really be you know um taken seriously and so I think want to make sure that municipal court is on that list that our road conditions are on that list and that we are addressing the issues in parks. And um to me that's really critical. And so I think the other part of you know when we went to the public and said public safety I also think that means um traffic calming. We've seen the number of pedestrian accidents where our people been injured or even worse killed. And and so to me that also means public safety. Public safety also means our firehouses. And um I think those are really important you know pieces for us to continue to highlight when it comes to new some of the new infrastructure for me. It was very clear that actually and then back in the you know um in the 60% of maintenance the library obviously right like that is a very clear ask from the community in terms of new infrastructure. Um, as councelor Corin said, recreational centers were a really big ask and that was a very popular ask for our constituents, especially constituents who don't have access to um as many parks in their communities as other potentially other neighborhoods um in the city do. And so, yes, I'm going to continue to advocate for rec center on um the west part of town and to make sure that, you know, that moves forward. And then I I think what I'm about to say now may be a little bit controversial and again I want to caveat that. I also want to note that the public safety um building complex that only one counselor during the budget session had that on their priority list. And now I I mean I know that if you maybe asked for that consensus today, you could potentially get a um majority support for that. But I did just I wanted to note that because I noticed that that only one counselor had that on their list and that obviously this is a m very much a staff priority but it was also not a priority largely by the public when we went out to the public and asked them to um you know name their support systems. And then the last thing I'll say is that I think you know we want to make sure that whatever we can do to ensure our water like our utilities um infrastructure is taken care of to me that is all very important. So I don't know if that's any more guidance. I just I wanted to note that and I think if you say well you know public safety we have to address something and we are right like the racetrack that has been very clearly an urgent request that has been made and we've been making it to the legislator then we're making it through this process and that to me felt like the most clear it has a plan. It's needed now um that can move forward and um to me the public safety complex was just not there. And again, I'm just one voice though naming that during the budget retreat. Um, that was not something highlighted by most folks. And thank you, Chris, and you know, the whole staff for getting us here. Mayor Pro. Thank you, Mayor. Um, Chris and Leslie and staff, thank you very much for putting this together as well. I'm glad that the Angler Road extension is on there. Um I um very close to um coun um councelor Karen's district and so I travel in and about and and we need we need some help there. Um also happy to see the parks projects uh road construction road calming and road repair on the list as well. So um for Chief Daniels uh in Chief Story I know we we talked about um design along with the training track for the joint public safety training facility. Um you know one thought that I do have have in mind is could we if it makes sense overall and I would like our uh my colleagues to to weigh in as well. Would it make sense to to um build now um and uh rather than design and and take that further down yours? Does it make sense to to do it um have a building now that that's a training facility that would make sense to to get to um fruition sooner rather than later and probably save us some money in the long term? And Chris, you can weigh in as well if you want to, but really want to talk to the subject matter experts. Uh both chiefs Chief Story, go ahead. Thank you, Mayor Mayor Prom. Jeremy Story, please chief for the record. That's a a very good point. I think we've been dealing with, you know, dilapidated double wide for a long long time. I think mayor went through I don't know if you went through the academy there or not, but um we're used to kind of beg begging and borrowing anything we can to accomplish training for so long that what we really want is a place to actually do the training. It doesn't have to be fancy. We don't need a Taj Mahal. Doesn't have to be bougie. We just want to get the training done. So, Chief Daniels and I actually were talking about this last week and trying to find a way to instead of taking 3 million for design, which is a lot of money just for design. I I admit that. I'd rather put that money into getting something that achieves the purpose now, like a metal building, a modular build or pre-fabricated metal building that does what we need to do without all the bells and whistles. And I think I'll let Chief Daniel speak to it. I mean, that's what fire has been leasing for a lot of money for a few years is essentially a metal building. And it's important the training building is not just meant to be a training building. and it's meant to accomplish the logistics piece, especially for fire that they're using the other building for right now. So, I I would support that. I think that's a really good idea. Mayor Prom, Chief Daniels, Mayor Mayor Prom, Mike Daniels, fire chief for the record. Um, no, I just wanted to uh uh just to echo chief's story. I think the naturally what we've seen is uh and what we're learning with even our regular facilities, the cost of construction doesn't get any less. Um and it seems to increase quite rapidly. U just the difference between station three and station 9 a few years apart is in the millions in construction increases for a station that's not much bigger. So, I think the more we continue to push it down, one, we're continuing to invest $18,000 a month in a facility that we don't own, that's that's our lease um amount, which is up in July for for renewal. [snorts] But the and we've been in the same boat. We've been in a we we've been kicked out of some facilities that had other plans and uh we've been forced to lease buildings over the years. Uh the first one was significantly smaller, still quite expensive. Then we moved to Valley Drive as we were growing and our facility needs were growing and our fleet wasn't [snorts] able to work on our vehicles in their in their facilities. So it's we look at it as very much a a not just police fire but it's also solving a fleet problem and and I agree that there is a a mechanism where we can look at some fabricated buildings and maybe reduce the cost and get something functional understanding that we may be able to add on and the design side once we get it designed it positions us well for being able to request capital outlay um because we're we continue to be told shovel ready projects, shovel ready projects, shovel ready projects. So, so this may also be augmented by by our ability to get legislative appropriations. Wonderful. Um, so it sounds like it's it's doable and you're leasing a building now rather than than u the city owning it. Um, Chris Leslie, from your perspective, is this is that doable? Mayor, mayor prom. I mean, if if one of the recommendations is for funding to go to that, we can certainly include that on the list here was listed as one of the things like we did discuss it as designed specifically before, but if there's conversations to do something different, staff direction would be all we would really need. Okay, great. Thank you. Thank you, mayor. Thank you, Chris. Thank you, Leslie. Uh again, something that I wanted to share was a thank you to the voters who voted for this GRT increase. It may seem like a list and it seems picking and choosing can be problematic at times, difficult, but the truth of the matter is we have added value. We can add value to our community and that that is something that speaks volumes. And again, I thank the voters that said yes to this increase. It's not so much the projects, it's the value. I know that there's bottlenecks at Angler. If we get a new wreck, there's going to be bottlenecks. I understand the traffic calming, all those things. So, you know, all those things have to take place. The library has been long overdue uh for being rehabilitated uh fire station one. But the training facility that to me has been something that was talked about back in 2007 that was going to get done. Giving us as firefighters and police officers this hope that someday we'll get that training facility. And here we are 2026 still talking about it. I think this is a great opportunity as both chiefs have said uh we get kicked around, we get moved around. Uh chief story I think we did our defensive tactics at Sisbar's in a vacant building that they had available. Uh so the the the fire department had tea time. We were booted out of that so that it could be sold. Uh we still we still have that. Um, so I I think it's it's very important that we we look at this public safety training facility. However, we can uh get it started so that we can start looking at external funding, whether it's federal dollars, state dollars, any way that we can get some some funding, some grants, anything that we can get to start building on once we get it started. So all those other things I I say they are priorities. They are important. that would be my priority. Um, and again to add value to our community. Thank you, Council Harris. Thanks, Michael Harris. For the record, I I also really like the thought of maybe downscoping the training facility. Um, I think it's very the training facility itself is very important. Um, you know, coming out of our budget retreat, it sounds like it's going to help a lot more departments than just the police department. They they need the track urgently. You know, like the chiefs are saying, they need space. Um, and instead of spending 3 million bucks to do a design and then waiting another couple years to put together tens of millions of dollars to actually build some some super fancy thing, you know, if we can throw a million bucks at it and get a giant steel building um that's roughly equivalent, a little better than what they've got now, that sounds like excellent value for the money if if that's something that um would help them out. And so I guess I'm I just was penciling things out here. I'm kind of seeing consensus on Bruins improvement because of the rec center uh parks. Um Angler Road. I had a question about that. How much does a million bucks actually get us on that project? Mayor, councelor Harris, I I don't know specifically. I think it was more to show commitment from the city and try and advocate for, you know, funds for that project. um from the state level. So, I mean, I you know, if it was something that council wanted to put money towards and it didn't pan out, maybe we could redirect those funds. Um I I I think it was just to kind of show them that, you know, it it is a high priority for the city. So, okay. So, there's no like concrete ask. We're just saying we we are willing to budget a million bucks of this towards this project and, you know, to to match whatever. Okay. Um, so yeah, with with those things and then, you know, filling gaps in other CIP projects, which I'm all for pushing things over the finish line. Um, that's that's about 8 million bucks. Thank you. Um, so sorry to that end, we were talking about uh traffic calming that those kind of projects probably would fit under maintenance as well because, you know, we're maintaining streets and adding traffic calming measures. Correct. Councelor Krin. Um, thank you. I just want to go back to the public safety training facility. I So I I I hear the idea of getting things done. Um, but the I think that on RCIP this has been somewhere between 20 and $60 million in its in its ultimate cost. um in the original draft of of what this looked like, that's that's about the area. And I I think the 20 was like 2007 prices. So I think that this the last I saw this was somewhere in the realm of 40 to $60 million. Um, and while I think thinking about it differently would be um would be welcome, I do not think that like I I don't think we can I don't I think we should neither short it in a way that makes it not as useful as it's meant to be. So, so to me, I feel like the fact that we're not sure what exactly we need um and what what role that's fil filling sort of speaks to the need to have a robust planning component to it because I wouldn't want us to say, "Oh, can can you get something for $3 million?" Um I know we can't like that that is not going to fill what what the projected needs are that that you're alluding to. So I I think um generally what seemed to come out was a question of whether this seemed like a lot of money for planning which is an abstract idea. But I do think that planning things is something that is best done thoughtfully and and with a lot of kind of input and and communication in terms of like it's not something that I think we could adequately do. So, um, I I just want to sort of speak to when I when I look at this and I think about a $60 million project, I think we need to invest in in planning it and making sure that we're we're serving the needs that we say we're going to serve. Um, I wouldn't want us to to think about doing something that was I I my sense is that it's more than it's north of 1 million and south of 60 million, but beyond that, we're not really sure what this will look like. So, uh, from from my perspective, having seen this and seeing it on the CIP is about $40 million, I think. Um, I I really would like to know more concretely what we're what we're really talking about building. um and where there's room to change or or do something different. Council Mccclure, just to clarify a little bit on the public safety, um would this be on land we own? I'm I keep getting confused about the driving track and the public safety building. Those are kind of adjacent to each other. Am I correct about that? And then we would own that land and currently the training facility for fire we don't own. Is that right? Okay. I'm just I'm just So I would say like scaling down would be a good one so that we we're already losing money by leasing. So if we can put it on land we already own, it makes more sense to me. That's pro. Sure. Um I think the these are all valid points and um you know the you know my suggestion is is not to um I I can't think of another word to short change the the departments uh definitely believe that you should get what what uh what you deserve and what works well right um if this is a start and we can start with a good strong solid foundation in a shell and it's still workable uh then definitely I I have consent expenses and I agree this is the route that we should take. So, um you know, if if it's if if it's a land that we owned, if it's something that we could start with um or even a shell with with the knowledge of maybe we might need to upgrade in the future, um I think it makes sense to to um go ahead and and start that up now. So, that would be my my thought, Mayor. Thank you. All right. Thank you. Uh for some clarity on the land and what's already there like uh fire station uh 7 already has a training tower things like that. Um Chief Story, do you have anything else to add on on that? Thank you, Mayor Jeremy. Please chief again for the record. The the lot that's identified for the driving track would be the same lot that we would intend to put the the training building on and that's just south of where fire station se seven and the training tower are. So, it's very convenient for both fire and us to have the training building out there. Um, and just on the on the concept of the metal building, the you know, it definitely would be more than three million to councelor Karan's point and it should definitely be less than what we're talking about with a traditional brick and mortar at 30 million plus. I think the goal would be if we can do it for 8 million, 10 million instead of 30, that's a win for everybody. It probably be done faster. One of the the one of the other reasons that we're asking for the training building and this is pri prior to 2007 that we've actually been working on this. I was talking to one of the retired lieutenants at Qualss this week and he's like I had you know I was working on that project in 2006. It's been a long time coming. We are bursting at the seams of a station. A new station if we're trying to tackle that project is 60 to 80 million or maybe more. If we are able to build this facility where we can move our academy over there, that will free up space at the East Mesa station, which maybe buy us a couple more years u so we don't exceed the growth. I mean, we're just bursting at the seams already, but that would relieve some of the pressure. And a metal building also can be expanded. So, one of the good things is we can get the bare, you know, make it nice, make it usable. We're not trying to cut the corners. We want to be able to do the training, but you can always add on to the metal building, which is a benefit to it in the future for other things that are are needed, but maybe not the things we need right this second. I hope that helps. Thank you, Chief. Chief Daniels, uh, what is the cost right now for the leasing of the facility on Valley Drive? Mr. Mayor Mike Daniels. The current is $18,000 a month is what we're paying plus utilities and is that scheduled to increase or is there like tier rental? Mr. Mayor, we are getting ready to start having those conversations with the owner because the the lease expires in 6 months. So So we're in the process of getting that renegotiated. Okay. Thank you. We expect we would expect that it's going to increase though. Great. Council Harris. Thanks, Michael Harris. For the record, um yeah, I wanted to clarify my position is is basically exactly what what Chief Story was saying. I am looking for iterative, you know, an iterative approach to this project rather than that gets us something now and then in the future we can add on to it to get us new things rather than saying we're going to spend $60 million on this great gleaming facility and it'll be ready in 10 years. Um, and in the meantime, you know, we're stuck with what we've got. So I it it sounds like the the departments have a good idea of what they need right this second and direction on where they might upgrade in the future. Um so obviously building those into the plans seems like it's very prudent. um you know don't we don't want to design if we're going to get a metal building we design it and put it on the land in such a way that it can be added on to later um and get classrooms or put in plumbing and fixtures and things where they can be um added. So I just just wanted to clarify that. Did you want Mayor Pro? Um no just one more comment. Uh just shifting gears a little bit and then a point of clarification um for Steve on the parks projects. One of the themes or comments that I had at the budget retreat was to ensure I know that the team is doing a great job. I just want you to continue doing that of making sure that those parks are accessible especially to our ADA u residents. Um pro roughly about you know 9.8 8 to about 11% of our kids in Los Cruus are a, you know, 88 and and would love to um see more kids in the park regardless of their abilities and uh also grandparents and great-grandparents that are able to traverse through parks would be my hope. Steve Bam, parks and direct director. Um mayor and um councelor Munes, mayor Tim Munes. Um yes, every design we do, everything we look at is to comply with ADA law and accessibility. And if anything, we look to go above and beyond to uh make it accessible to all individuals. Thank you, sir. Thank you. Another point of clarification, mayor, and um for our city clerk. So on so that the I think uh Chris mentioned wanting consensus um is it simple consensus it's a work session we don't necessarily vote on this so just with the context that that the counselors uh have provided then the uh staff goes forward and starts this up okay because it's almost Thanksgiving again so we want to get started thank you mayor All right. Thank you. Back to me. Yes. Okay. Um, so kind of what I'd like to do now is we, you know, we can wrap up conversation here in a minute on these new project, but I thought maybe we go back to the beginning and just make sure we're good on pay as you go recommendations, then the 60%, and then we can kind of lock in final direction on the 40. So, if you don't mind, I'll take you guys back to pay as you go. If we're all good with this slide, then I will move on to the next slide. Going once. I'm sorry. Correct. I apologize. I'm not objecting to this and it I I but I when you say going once, I react and push the button. So, if you ever want me, but I'm hoping that for the sake of people who weren't at the budget retreat, people who are listening, can you explain what you mean by pay as you go, please? Um, and and sort of talk about what this means in the bigger context of how this is going and then also when will we have to so pay as you go this year, next year? What is the sort of cyclical nature of these um two? If you could talk a little bit about that. I'll I'll turn the money stuff over to Leslie. So, Good afternoon, Mayor. Oh, you're taller than me, Chris. Councelor Corin. So, yes, we there's really two pots of money that we're looking at because we have begun to collect before we have bonded. So, the first pay as you go is going to be significantly more because we have and will continue to collect about 1.1 a month. So once that is spent and accounted for then going forward beginning in 28 we will have 13.1 but 8.8 of that has to go to debt service. So anything beyond that will be the pay as you go. Thank you. That's I just wanted every I I don't know that folks necessarily listening or or I I don't know that I understood this prior to you explaining it so well at the budget meeting exactly how this money is being divided and how some of it goes to debt and some of it goes to bonds and some of it is we can spend as we're going along and we've been collecting it for a little while um in the meantime. So thank you for just making that a little bit more explicit. Yes, councelor Harris. Um thanks. I guess I had a related question. Um so on the next slide maybe the next one where the the list of projects um yeah so what you're looking for direction on today is direction for that 15 million pay as you go that's available right now because we've already got some that we've been collecting and haven't spent. So this so so we have 15 now and then next year we're going to have four. Yeah. So Mr. Mayor, councelor Harris, I'm sorry. Ask that question one more time. I want to make sure I'm understanding before I answer. Sure. So what we're I want to clarify what we're what you're looking for direction on today. And my understanding is we're looking to direct the spending of about 15 million today. Yes. Because that's how much pay as you go funds we have currently and expect in the next two years through Yeah. Yes. June through July. Yes. Okay. Um and then next year when when we come back to have this discussion again, it'll be 4.4. Yeah. or whatever we collected estimated. Yeah, of course. Sure. Yep. Yep. No, no, it it it's could go up or down. Of course. Yes. Yep. Council, can you give us a little bit more on the deferred maintenance asset maintenance sort of give us some project ideas so that people just basically know what I know it's going to be roofs. It's going to be a lot of roofs, but a little bit more. It doesn't just have to be all roofs. I mean, there's a variety of of things and there's a lot of things on the CIP. I don't want to put Cynthia on the spot, but if she wants to come down and speak specifically to the wide range of projects on the CIP that would be under deferred maintenance, she probably is sort of the expert on that. Um, way more money than, you know, needed than we have right now, but it would be a good start. Good afternoon, mayor, city council. Cynthia Lamio, CIP manager. We do have a vast number of projects that need funding. Specifically talking about defer maintenance. We have a wide range of projects. As Chris mentioned, we have all of the several re- roofs that we need. We also have a couple building infrastructure uh improvements are needed that it goes from basic security improvements like fencing through actual improvements to some of the structural elements of a building. We know that fire stations are some of those elements. Uh bigger projects that go to the other extreme with municipal court, but some of our utilities buildings also need improvements and um I believe some internal CI uh city hall imp um improvements in general. Then we also have on the other end parking lots that need repairs and then we have replacement of generators that it's just one element but it's quite costly and it's a significant project that we want to be considered. Thank you. Okay, moving on from pay as you go, unless there's more questions. Go ahead, Chris. Okay, so moving into the 60% category, we're recommending improvements to fire station one, putting money into the street uh maintenance, um the fleet upkeep, and then specific facility maintenance to ADA compliance. Harris. Um, seems like there's a little less than 12 on these two slides. Right about 12. Yeah. Oh, okay. Cool. Good. Go ahead. Okay. And so Leslie and I were trying to do some math while we were keeping up with the discussion. Um I think what we were seeing is Bruins Lane seemed to be high priority. Um the uh funding for gaps in current CIP projects seem to have some support. um Angler Road, um then the municipal court, and then if there was a conversation about putting a certain amount of money towards the public safety facility. So, those were kind of the ones that we keyed in on, we can sort of work with staff to finalize exactly what those amounts should be for each of those. Some of these were kind of just more estimates, but we can if that's kind of the consensus there, we can take from there, refine that and as we come back with budget adjustments and and the ordinance for the um bonding, we'll have more specific numbers. So, if that's good direction, I think I will take that as a win. I just want to have you say on the record, sorry, that traffic calming is one of those things. Okay, mayor. Yes, council. Thank you. I Yes, I completely agree with councelor Mccclure. Traffic coming and then Chris, I'm sorry if I missed this before, but I know that it had been previously on the lists and I again I'm sorry if I missed it in your presentation, but is the traffic calming potentially light traffic light at Alama and Hogland? Has that been scrubbed? Because if it has, I want to advocate for talk about one of those things that's been 20 years in the making. That is one of them. Mayor Councelor Ben Ko know we have that as one of the priority projects for the pay as you go. Awesome. Thank Sorry about that. Thank you. I appreciate it. And I just feel very strongly about this. Thank you, Councelor Harris. Um, yeah, I also feel very strongly about making sure that we've got traffic calming projects in there and some kind of way to to make sure that those are able to be expended quickly on on smaller projects to get good return. Okay. Anything else, Chris? I'm good. Thank you. No, thank you again. Again, I I can't stress enough this adds value to our community and that's what we have to look at the big picture and uh I think this is great and uh we'll look forward to we'll be [snorts] back. Yes. What you bring back. All right. That was the only item on the agenda. Okay. Motion to adjurnn. I move to ajourn second. Munoz. This is on the motion to adjourn the work session. Councelor Mccclure, yes. Councelor Matise is absent. Councelor Harris, yes. Councelor Bencomo, yes. And thank you for letting me join via Zoom. Councelor Karan, yes. Councelor Munoz, yes. And mayor, yes.